A train is operating in CTC territory and stops at a control point with an absolute signal displaying 'Stop'. The crew needs to make a reverse movement just inside the block they came from to set out a car. According to GCOR, what is the first required action?
-
A
Obtain permission from the control operator before making any reverse movement.
-
B
Immediately begin the reverse movement at restricted speed, as it's within the same block.
-
C
Proceed through the stop signal, then initiate the reverse movement.
-
D
Wait for a more favorable signal indication before reversing.