A Large Quantity Generator (LQG) accumulates hazardous waste in a satellite accumulation area (SAA). The container of non-acute hazardous waste becomes full, reaching the 55-gallon limit. According to 40 CFR 262.15, what is the maximum time allowed for the generator to move this full container to the central accumulation area?
-
A
Within 24 hours of being filled.
-
B
Within 3 consecutive calendar days of being filled.
-
C
Within 7 business days of being filled.
-
D
Within 90 days of the accumulation start date.