Where is EV typically measured and EV technique applied?
Answer: Work packages within control accounts
EV is earned at work package or planning package level within control accounts.
Management reserve is included in which?
Answer: Contract Budget Base but not the PMB
MR is held outside the PMB but within the CBB.
A work package shows EV greater than its BAC. What does this suggest?
Answer: A data error or improper EV claim
EV cannot exceed the budget for the scope; this indicates a data problem.
Why does AC include accruals?
Answer: To capture work performed but not yet invoiced or paid
Accruals match cost to the period when work was performed.
What is the purpose of an Over Target Baseline?
Answer: Reset budgets when remaining work can't be managed against the existing baseline
An OTB incorporates cost overrun into the baseline with customer approval.
What is the schedule variance for Level of Effort tasks?
Answer: Zero, since EV equals PV
LOE EV is earned in step with time, so EV equals PV.
Which chart plots cumulative PV, EV, and AC over time?
Answer: S-curve
The S-curve compares cumulative PV, EV and AC across time.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- web.aacei.org — Eligibility, fees, exam format, passing score, renewal, retake fee, time limit, score validity, test delivery, retake policy · verified Nov 2026