Which ERP configuration concept allows a single material to be managed in multiple units of measure simultaneously (e.g., pieces and kilograms)?
-
A
Alternative unit of measure configuration in the material master
-
B
Batch classification with unit conversion
-
C
Valuation area split
-
D
Mixed costing variant