Which of the following best describes the fundamental principle of 'single-point responsibility' in the design-build project delivery method?
-
A
The owner holds separate contracts with the architect and the contractor, but designates the contractor as the single point of contact for all construction-related issues.
-
B
A single entity holds one contract with the owner and assumes sole responsibility for both the design and construction of the project.
-
C
The architect acts as the owner's agent, holding all subcontracts and bearing responsibility for the entire project outcome.
-
D
A third-party construction manager is hired by the owner to coordinate between the separately contracted design and construction firms.