What is the primary advantage of integrating quality management into the design phase of a design-build project?
-
A
Defects can be prevented in design before they become costly construction errors
-
B
It eliminates the need for third-party inspections during construction
-
C
It allows the owner to reduce the scope of commissioning activities
-
D
It shifts quality responsibility entirely to the design team