← All CHFM Flashcard Decks

CHFM - Certified Healthcare Facility Manager Maintenance and Operations Flashcards

6 cards from real CHFM practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 CHFM - Certified Healthcare Facility Manager Maintenance and Operations flashcards as text
  1. What is the primary purpose of a preventive maintenance (PM) program in a healthcare facility?

    Answer: To perform scheduled maintenance before failure occurs, reducing unplanned downtime and extending equipment life

    A PM program schedules regular maintenance activities before failures occur, improving reliability, extending equipment life, reducing emergency repairs, and maintaining regulatory compliance with NFPA and TJC requirements.

  2. Which type of maintenance is performed after an equipment failure has occurred?

    Answer: Corrective (reactive) maintenance

    Corrective maintenance (also called reactive maintenance or run-to-failure) is performed after an equipment failure to restore it to operational condition.

  3. In a hospital's CMMS (Computerized Maintenance Management System), what information is typically captured in a work order?

    Answer: Asset ID, work description, labor hours, parts used, technician assigned, and completion date

    A CMMS work order captures comprehensive information about each maintenance task: the asset involved, description of work performed, time spent, materials used, responsible technician, priority, status, and completion date.

  4. What does 'mean time between failures' (MTBF) measure for healthcare building equipment?

    Answer: The average time a piece of equipment operates between breakdowns, indicating its reliability

    MTBF measures equipment reliability by calculating the average time between failures. A higher MTBF indicates more reliable equipment; tracking MTBF over time can reveal deterioration and help predict when replacement is warranted.

  5. In healthcare facilities, which environmental control is critical for maintaining proper pressure relationships in an operating room?

    Answer: Positive pressure relative to adjacent areas, preventing outside contaminants from entering

    Operating rooms must maintain positive pressure relative to corridors and adjacent spaces, so that clean supply air flows outward, preventing contaminants from the less-clean corridor from entering the sterile field.

  6. What is the purpose of performing a megohm (insulation resistance) test on electrical motors in a healthcare facility?

    Answer: To detect insulation degradation that could lead to motor failure or electrical fault

    A megohmmeter applies high DC voltage to measure the resistance of motor winding insulation. Declining insulation resistance indicates moisture intrusion, contamination, or thermal degradation, allowing planned replacement before catastrophic failure.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. aha.org — Test delivery, fees, renewal, eligibility, exam format, registration deadline, retake policy, score release, test dates, time limit · verified Oct 2026