CFM Cheat Sheet 2026

The 30 highest-yield CFM facts, distilled from real exam questions. Print it, save it as a PDF, or study it here โ€” free, no sign-up.

120 questions
180 min time limit
70% to pass
  1. According to FEMA guidance, 'significant damage' to a flood damage-resistant material means damage that requires what? โ†’ More than cosmetic repair, such as removal or replacement
  2. A community that fails to enforce NFIP floodplain management requirements may be placed on what status? โ†’ Probation or Suspension
  3. The '100-year flood' is best described as a flood that has a: โ†’ 1% chance of being equaled or exceeded in any given year
  4. Local hazard mitigation plans must be reviewed, revised, and resubmitted for FEMA approval how often to keep eligibility for certain mitigation grants? โ†’ Every 5 years
  5. What inspection procedure is essential for maintenance protocols? โ†’ Systematic inspection following established checklists and standards
  6. In a Detailed Flood Insurance Study, cross-section data is used in hydraulic modeling to determine: โ†’ Water surface elevations at specific locations along a stream
  7. Which of the following wall materials is acceptable below the BFE? โ†’ Cement board
  8. A property owner placed engineered fill to raise a lot above the BFE and wants it removed from the SFHA. Which determination applies? โ†’ LOMR-F
  9. How should equipment be maintained for quality inspection operations? โ†’ Follow manufacturer-recommended preventive maintenance schedules
  10. What is the waiting period before a new Standard Flood Insurance Policy (SFIP) goes into effect? โ†’ 30 days
  11. What code compliance requirement applies to safety procedures? โ†’ All work must comply with applicable local, state, and national codes
  12. What is the primary purpose of a 'No-Rise Certification' in floodway encroachment analysis? โ†’ To demonstrate that proposed development will not increase the BFE in the floodway
  13. A Letter of Map Amendment (LOMA) is used to remove a property from the SFHA when the property's lowest adjacent grade is: โ†’ At or above the BFE based on natural ground
  14. A contractor proposes paper-faced gypsum wallboard for the walls of an enclosure below BFE in an AE zone. How should the floodplain manager respond? โ†’ Reject it because paper-faced gypsum board is not flood damage-resistant
  15. What federal legislation established the National Flood Insurance Program (NFIP)? โ†’ The National Flood Insurance Act of 1968
  16. Which NFIP regulation requires that new construction and substantial improvements be constructed with materials resistant to flood damage? โ†’ 44 CFR 60.3(a)(3)
  17. A 'substantial damage' determination triggers which requirement for the affected structure? โ†’ Compliance with current floodplain management regulations upon repair
  18. Which wood product is generally considered acceptable for use below the BFE? โ†’ Pressure-preservative-treated lumber
  19. Under 44 CFR 60.3, what elevation must a community obtain and keep on record for every new or substantially improved structure in the Special Flood Hazard Area? โ†’ The as-built elevation of the lowest floor, including any basement
  20. What inspection procedure is essential for equipment operation? โ†’ Systematic inspection following established checklists and standards
  21. Which of the following is an example of a nonstructural flood mitigation measure? โ†’ Elevating an existing home above the BFE
  22. What environmental protection measure applies to safety procedures? โ†’ Proper handling, storage, and disposal of materials according to environmental regulations
  23. What inspection procedure is essential for safety procedures? โ†’ Systematic inspection following established checklists and standards
  24. What environmental protection measure applies to maintenance protocols? โ†’ Proper handling, storage, and disposal of materials according to environmental regulations
  25. What is the most critical safety requirement in technical measurements? โ†’ Following all applicable safety regulations and wearing required PPE
  26. Under 44 CFR 60.6, when a variance allows a lowest floor below the BFE, the applicant must be told in writing that flood insurance premiums could go as high as: โ†’ $25 per $100 of coverage
  27. Which of these is generally considered an acceptable structural floor material below the BFE? โ†’ Reinforced concrete slab
  28. Which Risk MAP non-regulatory product shows the estimated water depth across the floodplain for a given flood frequency? โ†’ Depth Grid
  29. What is a common unintended consequence of channelizing a stream to reduce local flooding? โ†’ Higher flood peaks and erosion downstream
  30. Which of the following is NOT considered 'development' under NFIP definitions? โ†’ Routine lawn mowing and landscaping maintenance

What Practice Test Geeks adds beyond an AI chat for CFM

An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:

  • A timed, full-length CFM mock exam โ€” 120 questions in 180 minutes with a 70% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
  • A fixed CFM question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
  • Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
  • CFM flashcards built from the same question bank.
  • Free CFM practice tests with the correct answer shown after each question.
Start the Timed CFM Mock Exam โ†’
Was this helpful?

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. illinoisfloods.org โ€” Fees, test delivery, exam information ยท verified Nov 2026
  2. floods.org โ€” Late registration, eligibility, fees, exam format, passing score, renewal, retake fee, retake policy, score release, time limit ยท verified Nov 2026