Certified Floodplain Manager (CFM) Exam — Questions and Answers
Question 1: What distinguishes a Letter of Map Revision Based on Fill (LOMR-F) from a LOMA?
- A LOMR-F only applies to commercial structures
- A LOMR-F requires an engineer's seal; a LOMA does not
- A LOMR-F is issued by the community; a LOMA is self-certified
- A LOMR-F addresses properties elevated by fill; a LOMA addresses naturally elevated properties (Correct answer)
Correct answer: A LOMR-F addresses properties elevated by fill; a LOMA addresses naturally elevated properties
A LOMR-F is used when a property has been elevated above the BFE through the placement of fill, while a LOMA applies to land that is naturally above the BFE.
Question 2: Under FEMA Technical Bulletin 2, what minimum duration of contact with floodwaters defines 'prolonged contact' for flood damage-resistant materials?
- 7 days
- 24 hours
- 72 hours (Correct answer)
- 48 hours
Correct answer: 72 hours
FEMA defines prolonged contact as at least 72 hours of exposure to floodwaters.
Question 3: What is the most critical safety requirement in environmental standards?
- Speed of completion
- Following all applicable safety regulations and wearing required PPE (Correct answer)
- Working alone to avoid delays
- Cost minimization
Correct answer: Following all applicable safety regulations and wearing required PPE
Safety regulations and proper PPE use are the most critical requirements in environmental standards to prevent injury and ensure compliance.
Question 4: What does the 'regulatory floodway' represent in a hydraulic study?
- The entire 100-year floodplain
- The channel and adjacent floodplain reserved to carry base flood flows without increasing BFE by more than 1 foot (Correct answer)
- The area between the 10-year and 100-year flood boundaries
- The area subject to wave action
Correct answer: The channel and adjacent floodplain reserved to carry base flood flows without increasing BFE by more than 1 foot
The regulatory floodway is the channel plus the portion of floodplain that must remain open to convey the base flood discharge without increasing BFE by more than 1 foot.
Question 5: What is the purpose of floodplain modeling?
- To calculate flood damage costs.
- To evaluate the effectiveness of flood barriers.
- To determine flood insurance premiums.
- To simulate flood conditions and assess risk.
Floodplain modeling uses computer simulations to predict how water will flow and spread during various flood events. This helps in understanding potential flood depths, velocities, and extents, which is crucial for assessing flood risk to properties and infrastructure. The results inform floodplain mapping, land-use planning, and the design of effective mitigation measures.
Question 6: How is the floodplain delineated in flood risk mapping?
- By setting up water markers at critical elevations.
- By analyzing the impact of past flood events on property value.
- By evaluating flood history and current flood risk maps.
- By determining flood-prone zones based on satellite imaging.
FEMA flood zones categorize areas by flood risk. Zone V (Velocity Zone) represents areas subject to high-velocity wave action and/or coastal erosion, typically found along coastlines and estuaries. These areas are considered the highest risk due to the combined forces of storm surge and waves, requiring the most stringent building standards.
Question 7: What is the role of a Floodplain Administrator in the NFIP?
- Monitoring and enforcing local floodplain management regulations.
- Managing the flood insurance claims process.
- Designing flood mitigation structures.
- Providing technical support to the public during floods.
The Floodplain Administrator is the local official responsible for implementing and enforcing the community's floodplain management ordinance, which aligns with NFIP requirements. Their duties include reviewing development permits, ensuring new construction meets flood-resistant standards, maintaining records, and providing information to the public. This role is central to a community's participation in the NFIP and its efforts to reduce flood risk.
Question 8: Which of the following is a common floodplain mitigation technique?
- Incentive-based development programs.
- Floodplain reclamation.
- Construction of flood-control structures.
- Floodplain zoning and land-use regulation.
Non-structural floodplain mitigation measures focus on modifying human behavior and development rather than constructing physical barriers. Zoning restrictions and floodplain mapping are prime examples, as they guide land use, inform development decisions, and raise awareness of flood hazards without altering the natural flow of water.
Question 9: What is the primary distinction between a 'riverine' flood and a 'coastal' flood in NFIP mapping?
- Riverine flooding is driven by overbank discharge from streams; coastal flooding includes tidal surge and wave action (Correct answer)
- Riverine floods are mapped with Zone AE; coastal floods are mapped with Zone X only
- Riverine floods occur only inland; coastal floods can occur anywhere
- Riverine floods have no BFE; coastal floods always do
Correct answer: Riverine flooding is driven by overbank discharge from streams; coastal flooding includes tidal surge and wave action
Riverine flooding results from excess streamflow overtopping banks, while coastal flooding is caused by storm surge, tidal action, and wave energy from the ocean or large lakes.
Question 10: What environmental protection measure applies to safety procedures?
- Environmental rules only apply to large corporations
- Environmental concerns do not apply to this field
- Proper handling, storage, and disposal of materials according to environmental regulations (Correct answer)
- Follow environmental rules only if specifically asked
Correct answer: Proper handling, storage, and disposal of materials according to environmental regulations
Proper handling, storage, and disposal of all materials according to environmental regulations is a legal obligation in all trades.
Question 11: When reviewing a permit application, a floodplain administrator discovers the proposed fill will increase BFE by 0.5 feet upstream. What step is required?
- Issue the permit with a note in the file
- Submit a Conditional Letter of Map Revision to FEMA
- Notify adjacent property owners only
- Require a No-Rise Certification from a licensed engineer (Correct answer)
Correct answer: Require a No-Rise Certification from a licensed engineer
Any development proposed in a regulatory floodway must be accompanied by a No-Rise Certification demonstrating that the project will not increase BFE.
Question 12: For utility and service equipment that cannot be elevated above the BFE, NFIP regulations require it to be:
- Painted with waterproof paint
- Designed and installed to prevent water from entering or accumulating in its components (Correct answer)
- Covered with plastic sheeting
- Installed only in V zones
Correct answer: Designed and installed to prevent water from entering or accumulating in its components
44 CFR 60.3(a)(3)(iv) requires service facilities to be designed or located to prevent water from entering or accumulating within components.
Question 13: For new construction in a V Zone, what part of the building must be elevated to or above the BFE?
- The top of the lowest floor slab
- The top of the foundation piles
- The bottom of the lowest horizontal structural member of the lowest floor (Correct answer)
- The lowest electrical outlet
Correct answer: The bottom of the lowest horizontal structural member of the lowest floor
44 CFR 60.3(e)(4) uses the bottom of the lowest horizontal structural member as the V Zone elevation reference.
Question 14: Which section of the Code of Federal Regulations contains the NFIP floodplain management criteria for flood-prone areas that participating communities must adopt?
- 44 CFR 59.1
- 44 CFR 65.4
- 44 CFR 60.3 (Correct answer)
- 44 CFR 70.1
Correct answer: 44 CFR 60.3
44 CFR 60.3 sets the minimum floodplain management criteria tied to the data FEMA provides a community.
Question 15: Which USACE software is most commonly used for one- and two-dimensional hydraulic modeling of riverine floodplains for FEMA studies?
- HEC-HMS
- TR-20
- HEC-RAS (Correct answer)
- SWMM
Correct answer: HEC-RAS
HEC-RAS (River Analysis System) computes water-surface elevations for hydraulic studies.
Question 16: Before issuing a floodplain development permit, the floodplain administrator must make sure the applicant has:
- Paid into the Increased Cost of Compliance fund
- Bought a Preferred Risk Policy
- Got a Letter of Map Amendment
- Got all required federal, state, and local permits, such as a Clean Water Act Section 404 permit (Correct answer)
Correct answer: Got all required federal, state, and local permits, such as a Clean Water Act Section 404 permit
44 CFR 60.3(a)(2) requires review to confirm all other necessary government permits have been obtained.
Question 17: Which soil hydrologic group has the highest runoff potential in the SCS method?
- Group D (Correct answer)
- Group C
- Group A
- Group B
Correct answer: Group D
Hydrologic Soil Group D includes soils with very slow infiltration rates (e.g., heavy clays), resulting in the highest runoff potential when wetted.
Question 18: Under 44 CFR 65.3, within how long must a community notify FEMA of physical changes affecting flood hazards once technical data are available?
- 90 days
- 6 months (Correct answer)
- 30 days
- 1 year
Correct answer: 6 months
Communities must submit technical data for changes affecting BFEs as soon as practicable but no later than six months after the information becomes available.
Question 19: Under the NFIP, what is the standard maximum building coverage limit for a single-family residential structure?
- $150,000
- $250,000 (Correct answer)
- $100,000
- $500,000
Correct answer: $250,000
The standard NFIP flood insurance policy provides a maximum of $250,000 in building coverage for residential structures.
Question 20: What is the role of the National Flood Insurance Program (NFIP) in floodplain management?
- To manage flood insurance premiums across the country.
- To provide technical support for floodplain mapping.
- To encourage communities to adopt floodplain management regulations and offer flood insurance.
- To limit flood insurance coverage in urban areas.
The NFIP has a dual purpose: to provide affordable flood insurance to property owners and to reduce flood damage through floodplain management. It incentivizes communities to adopt and enforce minimum floodplain management standards in exchange for their residents being able to purchase federally backed flood insurance. This partnership aims to shift the financial burden of flood losses from taxpayers to those who benefit from living in flood-prone areas, while also promoting safer development.
Question 21: A Detailed Flood Insurance Study uses the term 'Q100' to refer to:
- The volume of runoff from a 100-year storm
- The 100-year return period storm duration
- The 100-year cumulative rainfall depth
- The peak discharge of the 1% annual chance flood (Correct answer)
Correct answer: The peak discharge of the 1% annual chance flood
Q100 denotes the peak streamflow discharge associated with the 1% annual chance (100-year) flood event, used as input into hydraulic models to compute BFE.
Question 22: What is the main objective of floodplain buyouts?
- To offer financial assistance to flood-prone residents.
- To promote floodplain development.
- To relocate people out of flood-prone areas.
- To rebuild infrastructure in flood zones.
Floodplain buyouts are a proactive mitigation strategy where properties in high-risk flood areas are purchased, often with federal funding. The primary objective is to permanently remove structures and residents from the floodplain, thereby eliminating future flood damage and reducing the need for emergency response and repeated recovery efforts. This also often allows the land to revert to open space or natural floodplain functions, providing environmental benefits.
Question 23: How do floodplain management regulations influence development in floodplains?
- They prohibit all development in flood-prone areas.
- They regulate development to ensure it is resistant to flooding.
- They promote the development of commercial areas in flood zones.
- They only regulate construction near riverbanks.
Floodplain management regulations do not typically prohibit all development, but rather guide and restrict it to minimize flood damage. These regulations mandate specific construction standards, such as elevating structures, using flood-resistant materials, and ensuring proper drainage, to make new development more resilient to flooding. The goal is to allow appropriate development while reducing risk to life and property.
Question 24: Dry floodproofing is usually limited to flood depths of about 3 feet against typical building walls mainly because of what?
- Erosion and scour around the footings
- Hydrostatic pressure that can cause wall failure or uplift (Correct answer)
- Debris impact loads
- Buoyancy of interior furnishings
Correct answer: Hydrostatic pressure that can cause wall failure or uplift
Lateral and uplift hydrostatic forces grow quickly with depth and can collapse walls or floors not designed to resist them.
Question 25: A contractor proposes paper-faced gypsum wallboard for the walls of an enclosure below BFE in an AE zone. How should the floodplain manager respond?
- Approve it if it is installed 6 inches above the slab
- Approve it if the enclosure has flood openings
- Approve it if it is painted with latex paint
- Reject it because paper-faced gypsum board is not flood damage-resistant (Correct answer)
Correct answer: Reject it because paper-faced gypsum board is not flood damage-resistant
Paper-faced gypsum wallboard absorbs water and loses integrity, so it is unacceptable below the BFE.
Question 26: What environmental protection measure applies to technical measurements?
- Environmental rules only apply to large corporations
- Environmental concerns do not apply to this field
- Follow environmental rules only if specifically asked
- Proper handling, storage, and disposal of materials according to environmental regulations (Correct answer)
Correct answer: Proper handling, storage, and disposal of materials according to environmental regulations
Proper handling, storage, and disposal of all materials according to environmental regulations is a legal obligation in all trades.
Question 27: The 'regulatory floodway fringe' (flood fringe) is defined as:
- The area between the 10-year and 50-year flood boundaries
- The area within the floodway where development is prohibited
- The portion of the 100-year floodplain outside the floodway that can accommodate limited development (Correct answer)
- The coastal zone subject to wave run-up
Correct answer: The portion of the 100-year floodplain outside the floodway that can accommodate limited development
The flood fringe is the area of the 100-year floodplain outside the designated floodway; it can be developed if structures are elevated to or above BFE.
Question 28: What is the maximum height above adjacent grade for the bottom of required flood openings in an enclosure?
- 3 feet
- 6 inches
- 2 feet
- 1 foot (Correct answer)
Correct answer: 1 foot
The bottom of each opening must be no higher than 1 foot above the higher of the exterior or interior grade.
Question 29: What is the waiting period before a new Standard Flood Insurance Policy (SFIP) goes into effect?
- 15 days
- 30 days (Correct answer)
- 60 days
- No waiting period
Correct answer: 30 days
There is generally a 30-day waiting period before a new NFIP policy takes effect, with limited exceptions such as when insurance is purchased in connection with a loan closing.
Question 30: A developer wants FEMA's comment on whether a proposed channel project would change the SFHA before construction begins. What should be requested?
- Physical Map Revision
- LOMA
- LOMR
- CLOMR (Correct answer)
Correct answer: CLOMR
A CLOMR is FEMA's comment on a proposed project that would change hydrologic or hydraulic characteristics.
Question 31: Which of the following best describes the 'two-step process' for issuing a Conditional Letter of Map Revision (CLOMR)?
- FEMA review of proposed project followed by LOMR issuance after project completion (Correct answer)
- Engineering study followed by public comment period
- Community approval followed by state approval
- Pre-application conference followed by formal submission
Correct answer: FEMA review of proposed project followed by LOMR issuance after project completion
A CLOMR comments on a proposed project's effect on flood hazards before construction; after the project is complete and certified, a LOMR officially revises the FIRM.
Question 32: What code compliance requirement applies to code compliance?
- Codes are guidelines, not requirements
- Follow codes only when inspectors are present
- All work must comply with applicable local, state, and national codes (Correct answer)
- Code compliance only matters for commercial projects
Correct answer: All work must comply with applicable local, state, and national codes
Code compliance is mandatory for all work, ensuring safety, quality, and legal adherence.
Question 33: A community acquires flood-prone homes with FEMA Hazard Mitigation Assistance funds. What must happen to the land afterward?
- It may be resold for development after 10 years
- It must be deed-restricted to open space uses in perpetuity (Correct answer)
- It can be used for any public building that meets freeboard
- It must be converted to a stormwater detention basin
Correct answer: It must be deed-restricted to open space uses in perpetuity
FEMA-funded acquisition requires a permanent deed restriction limiting the property to open space, recreational, or wetland uses.
Question 34: What inspection procedure is essential for code compliance?
- Systematic inspection following established checklists and standards (Correct answer)
- The client determines inspection requirements
- Inspection is only needed for final sign-off
- Visual spot checks are sufficient
Correct answer: Systematic inspection following established checklists and standards
Systematic inspections using established checklists and industry standards ensure quality and compliance at every stage.
Question 35: What is the most critical safety requirement in maintenance protocols?
- Following all applicable safety regulations and wearing required PPE (Correct answer)
- Working alone to avoid delays
- Speed of completion
- Cost minimization
Correct answer: Following all applicable safety regulations and wearing required PPE
Safety regulations and proper PPE use are the most critical requirements in maintenance protocols to prevent injury and ensure compliance.
Question 36: What inspection procedure is essential for quality inspection?
- Systematic inspection following established checklists and standards (Correct answer)
- Visual spot checks are sufficient
- Inspection is only needed for final sign-off
- The client determines inspection requirements
Correct answer: Systematic inspection following established checklists and standards
Systematic inspections using established checklists and industry standards ensure quality and compliance at every stage.
Question 37: Which FEMA loss-estimation software uses GIS to model potential flood damages and economic losses for a community?
- Hazus (Correct answer)
- HEC-RAS
- CHAMP
- FLO-2D
Correct answer: Hazus
Hazus estimates physical, economic, and social impacts of floods and other hazards.
Question 38: Which of the following is not a typical measure of floodplain management?
- Construction of floodwalls and levees.
- Raising building foundations to flood-proof levels.
- Water diversion for irrigation purposes.
- Floodplain zoning and land-use regulations.
Floodplain management focuses on reducing flood damage and protecting natural floodplain functions through regulatory and structural measures. While floodplain zoning, floodwalls, and elevating buildings are direct strategies to manage flood risk, water diversion for irrigation is a water resource management practice. It is generally unrelated to the specific goals of mitigating flood hazards or regulating development within floodplains.
Question 39: When calculating market value for a substantial improvement or substantial damage determination, which value should be used?
- The mortgage balance on the property
- The replacement cost of the land
- Land and structure combined
- Structure only, excluding the land (Correct answer)
Correct answer: Structure only, excluding the land
Market value for SI/SD covers only the structure, never the land.
Question 40: What code compliance requirement applies to equipment operation?
- Code compliance only matters for commercial projects
- All work must comply with applicable local, state, and national codes (Correct answer)
- Follow codes only when inspectors are present
- Codes are guidelines, not requirements
Correct answer: All work must comply with applicable local, state, and national codes
Code compliance is mandatory for all work, ensuring safety, quality, and legal adherence.
Question 41: An NFIP-insured building has had four flood claims, each over $5,000, totaling $28,000. How is it classified?
- Substantially damaged property
- Repetitive loss property only
- Pre-FIRM exempt property
- Severe repetitive loss property (Correct answer)
Correct answer: Severe repetitive loss property
Severe repetitive loss includes four or more claims each exceeding $5,000 with a cumulative total over $20,000.
Question 42: Which of the following best describes 'effective hydraulic connectivity' in floodplain management?
- The efficiency of stormwater inlets in capturing runoff
- The structural connection between levee panels
- The ability of floodwaters to move freely across the floodplain without obstruction (Correct answer)
- The link between FEMA's mapping database and local GIS systems
Correct answer: The ability of floodwaters to move freely across the floodplain without obstruction
Effective hydraulic connectivity refers to the unobstructed movement of floodwaters across the floodplain, which is critical for maintaining conveyance and reducing upstream flood levels.
Question 43: A community requests a project-based map update that changes BFEs and zone boundaries across several panels and requires reissuing them. This is best described as:
- Letter of Determination Review
- LOMR-F
- LOMA
- Physical Map Revision (PMR) (Correct answer)
Correct answer: Physical Map Revision (PMR)
A PMR republishes affected FIRM panels when changes are too extensive for a LOMR.
Question 44: How should equipment be maintained for material selection operations?
- Maintenance is optional for newer equipment
- Inspect equipment annually only
- Follow manufacturer-recommended preventive maintenance schedules (Correct answer)
- Fix equipment only when it breaks
Correct answer: Follow manufacturer-recommended preventive maintenance schedules
Preventive maintenance following manufacturer recommendations ensures equipment reliability, safety, and longevity.
Question 45: Under 44 CFR 60.6, when a variance allows a lowest floor below the BFE, the applicant must be told in writing that flood insurance premiums could go as high as:
- $5 per $100 of coverage
- $50 per $100 of coverage
- $25 per $100 of coverage (Correct answer)
- $100 per $100 of coverage
Correct answer: $25 per $100 of coverage
The regulation requires written notice that premiums may reach $25 per $100 of insurance coverage.
Question 46: What is the purpose of the Flood Insurance Rate Map (FIRM)?
- To assess the environmental impact of floodplains.
- To identify flood zones and areas with a risk of flooding.
- To determine the cost of flood insurance.
- To regulate floodplain development.
The Base Flood Elevation (BFE) is the computed elevation to which floodwater is anticipated to rise during the base flood, which is the 1-percent-annual-chance flood (often called the 100-year flood). It serves as a critical regulatory benchmark in floodplain management, dictating minimum elevation requirements for new construction and substantial improvements in flood-prone areas.
Question 47: Which of the following is an example of a nonstructural flood mitigation measure?
- Channelizing a stream to increase conveyance
- Constructing a levee around a neighborhood
- Building an upstream flood control dam
- Elevating an existing home above the BFE (Correct answer)
Correct answer: Elevating an existing home above the BFE
Nonstructural measures modify buildings or land use rather than controlling floodwater with large engineered works.
Question 48: What is the most critical safety requirement in code compliance?
- Working alone to avoid delays
- Cost minimization
- Speed of completion
- Following all applicable safety regulations and wearing required PPE (Correct answer)
Correct answer: Following all applicable safety regulations and wearing required PPE
Safety regulations and proper PPE use are the most critical requirements in code compliance to prevent injury and ensure compliance.
Question 49: What inspection procedure is essential for equipment operation?
- The client determines inspection requirements
- Systematic inspection following established checklists and standards (Correct answer)
- Inspection is only needed for final sign-off
- Visual spot checks are sufficient
Correct answer: Systematic inspection following established checklists and standards
Systematic inspections using established checklists and industry standards ensure quality and compliance at every stage.
Question 50: What is the most critical safety requirement in equipment operation?
- Cost minimization
- Speed of completion
- Following all applicable safety regulations and wearing required PPE (Correct answer)
- Working alone to avoid delays
Correct answer: Following all applicable safety regulations and wearing required PPE
Safety regulations and proper PPE use are the most critical requirements in equipment operation to prevent injury and ensure compliance.
Question 51: Which parameter in the SCS Curve Number method most directly reflects soil type and land use?
- Hydraulic radius
- Lag time
- Curve Number (CN) (Correct answer)
- Time of concentration (Tc)
Correct answer: Curve Number (CN)
The Curve Number (CN) encapsulates the combined effect of soil hydrologic group and land cover/use to estimate direct runoff from rainfall.
Question 52: Which insulation type is generally considered acceptable for use below the BFE?
- Fiberglass batt insulation
- Cellulose loose-fill insulation
- Closed-cell foam insulation (Correct answer)
- Mineral wool batts with kraft paper facing
Correct answer: Closed-cell foam insulation
Closed-cell foam resists water absorption, making it acceptable under FEMA flood damage-resistant material guidance.
Question 53: What inspection procedure is essential for technical measurements?
- Systematic inspection following established checklists and standards (Correct answer)
- The client determines inspection requirements
- Visual spot checks are sufficient
- Inspection is only needed for final sign-off
Correct answer: Systematic inspection following established checklists and standards
Systematic inspections using established checklists and industry standards ensure quality and compliance at every stage.
Question 54: Which of the following is the correct interpretation of a 26% probability of flooding over a 30-year mortgage period?
- The property floods every 4 years on average
- A 26% annual chance of flooding
- Approximately equivalent to a 1% annual chance flood over 30 years (Correct answer)
- The property is in Zone X (shaded)
Correct answer: Approximately equivalent to a 1% annual chance flood over 30 years
A structure in the 1% annual chance floodplain has approximately a 26% cumulative probability of flooding at least once during a 30-year mortgage term.
Question 55: What is the maximum Increased Cost of Compliance (ICC) payment available under a Standard Flood Insurance Policy?
- $30,000 (Correct answer)
- $50,000
- $15,000
- $60,000
Correct answer: $30,000
ICC provides up to $30,000 to help bring substantially damaged insured buildings into compliance through elevation, floodproofing, relocation, or demolition.
Question 56: What does a Flood Insurance Rate Map (FIRM) show that an older Flood Hazard Boundary Map (FHBM) did not?
- The general location of the 100-year floodplain only
- Historical flood extents from recorded events
- Levee certification status
- Base Flood Elevations and insurance risk zones (Correct answer)
Correct answer: Base Flood Elevations and insurance risk zones
FIRMs include Base Flood Elevations and detailed flood insurance risk zones derived from engineering studies, providing quantitative data that FHBMs lacked.
Question 57: Which material is acceptable for exposed interior surfaces below the BFE?
- Cork tiles
- Glazed ceramic wall tile with waterproof grout (Correct answer)
- Hardwood paneling
- Wallpaper over drywall
Correct answer: Glazed ceramic wall tile with waterproof grout
Glazed ceramic tile with waterproof grout tolerates prolonged flooding and needs only cleaning.
Question 58: A 'substantial damage' determination triggers which requirement for the affected structure?
- Mandatory elevation to 2 feet above BFE
- Compliance with current floodplain management regulations upon repair (Correct answer)
- Immediate demolition
- Federal acquisition under the Hazard Mitigation Grant Program
Correct answer: Compliance with current floodplain management regulations upon repair
A substantially damaged structure must be brought into full compliance with current floodplain management standards before it can be repaired or rebuilt.
Question 59: How can local governments improve floodplain management?
- By promoting unrestricted development in floodplains.
- By eliminating flood insurance requirements.
- By limiting the development of flood control infrastructure.
- By implementing and enforcing floodplain management policies.
Local governments are at the forefront of effective floodplain management. Improving their efforts involves rigorously implementing and consistently enforcing local floodplain ordinances and policies, which are often based on NFIP standards. This ensures that development in flood-prone areas is safe, resilient, and minimizes future flood losses, thereby protecting both residents and community resources.
Question 60: What code compliance requirement applies to safety procedures?
- Follow codes only when inspectors are present
- Codes are guidelines, not requirements
- All work must comply with applicable local, state, and national codes (Correct answer)
- Code compliance only matters for commercial projects
Correct answer: All work must comply with applicable local, state, and national codes
Code compliance is mandatory for all work, ensuring safety, quality, and legal adherence.
Question 61: In a Detailed Flood Insurance Study, cross-section data is used in hydraulic modeling to determine:
- Soil permeability
- Groundwater recharge rates
- Water surface elevations at specific locations along a stream (Correct answer)
- Storm sewer capacity
Correct answer: Water surface elevations at specific locations along a stream
Cross-sections represent channel and floodplain geometry at selected locations, enabling HEC-RAS or similar models to compute water surface elevations for the base flood discharge.
Question 62: In a coastal V zone, which fastener material is typically recommended for metal connectors exposed to salt spray and flooding?
- Plain carbon steel
- Electro-galvanized steel
- Stainless steel (Correct answer)
- Aluminum-coated copper
Correct answer: Stainless steel
FEMA guidance (Technical Bulletin 8) recommends stainless steel connectors in harsh coastal exposures where corrosion is severe.
Question 63: For FEMA to accredit a riverine levee, the minimum freeboard above the base flood elevation is generally how much?
- 1 foot
- 3 feet (Correct answer)
- 2 feet
- 5 feet
Correct answer: 3 feet
44 CFR 65.10 generally requires at least 3 feet of freeboard for riverine levees, with more near structures and at the upstream end.
Question 64: Who is typically responsible for implementing floodplain management regulations?
- Private flood management firms.
- State governments only.
- The Floodplain Administrator and local authorities.
- The Federal Emergency Management Agency (FEMA).
While FEMA sets national standards and provides oversight for the National Flood Insurance Program (NFIP), the actual implementation and enforcement of floodplain management regulations occur at the local level. The designated Floodplain Administrator, working within local government authorities (e.g., planning, building departments), is directly responsible for reviewing permits, ensuring compliance, and administering local ordinances.
Question 65: The Limit of Moderate Wave Action (LiMWA) on a FIRM marks the inland limit of what wave height?
- 0.5 foot
- 3.0 feet
- 2.0 feet
- 1.5 feet (Correct answer)
Correct answer: 1.5 feet
The LiMWA marks the inland extent of 1.5-foot breaking waves, bounding the Coastal A Zone.
Question 66: What environmental protection measure applies to equipment operation?
- Environmental rules only apply to large corporations
- Environmental concerns do not apply to this field
- Follow environmental rules only if specifically asked
- Proper handling, storage, and disposal of materials according to environmental regulations (Correct answer)
Correct answer: Proper handling, storage, and disposal of materials according to environmental regulations
Proper handling, storage, and disposal of all materials according to environmental regulations is a legal obligation in all trades.
Question 67: Zone AE information along a studied stream shows a floodway width and mean velocity at each lettered cross section. Where is this data published?
- Elevation Certificate
- Summary of Elevations table
- Letter of Map Change summary
- Floodway Data Table in the FIS report (Correct answer)
Correct answer: Floodway Data Table in the FIS report
The FIS Floodway Data Table lists width, section area, mean velocity, and with/without-floodway elevations by cross section.
Question 68: Which flooring material is acceptable below the BFE per FEMA guidance?
- Laminate flooring with fiberboard core
- Wall-to-wall carpet over padding
- Engineered hardwood flooring
- Ceramic tile set in cement mortar (Correct answer)
Correct answer: Ceramic tile set in cement mortar
Ceramic tile with cement-based mortar withstands prolonged flooding with only cleaning required.
Question 69: What is a common unintended consequence of channelizing a stream to reduce local flooding?
- Higher flood peaks and erosion downstream (Correct answer)
- Less sediment moving downstream
- A larger mapped floodway upstream
- Lower velocities throughout the watershed
Correct answer: Higher flood peaks and erosion downstream
Straightened, smoother channels move water faster, which can raise peak flows and cause erosion and flooding downstream.
Question 70: What minimum number of flood openings (vents) is required per enclosed area below BFE, and what is the minimum net open area per square foot of enclosed space?
- 1 opening; 1 sq in per sq ft
- 1 opening; 2 sq in per sq ft
- 2 openings; 2 sq in per sq ft
- 2 openings; 1 sq in per sq ft (Correct answer)
Correct answer: 2 openings; 1 sq in per sq ft
NFIP requires a minimum of two flood openings per enclosed area with at least 1 square inch of net open area for every 1 square foot of enclosed space.
Question 71: What best describes the NFIP Emergency Program?
- The initial phase of participation offering limited insurance coverage before a detailed FIRM is issued (Correct answer)
- A program that pays for buyouts of repetitive loss properties
- A temporary suspension status for noncompliant communities
- A program that provides disaster grants after a presidential declaration
Correct answer: The initial phase of participation offering limited insurance coverage before a detailed FIRM is issued
Emergency Program communities get limited coverage amounts until they convert to the Regular Program with a detailed FIRM.
Question 72: Under NFIP regulations, enclosed areas below the lowest floor of an elevated building in an A zone must have flood openings providing at least how much net open area?
- 2 square inches per square foot of enclosed area
- 1 square inch per square foot of enclosed area (Correct answer)
- 1 square inch per 10 square feet of enclosed area
- 1 square foot per 100 square feet of enclosed area
Correct answer: 1 square inch per square foot of enclosed area
Non-engineered flood openings must total at least 1 square inch of net open area for every square foot of enclosed area to equalize hydrostatic pressure.
Question 73: What is the purpose of a 'starting water surface elevation' (tailwater) in a HEC-RAS steady-flow analysis?
- To define the downstream boundary condition from which water surface profiles are computed upstream (Correct answer)
- To set the upstream boundary condition for the model
- To calibrate the Manning's n value
- To establish the normal depth for culvert design
Correct answer: To define the downstream boundary condition from which water surface profiles are computed upstream
In subcritical (low-energy) flow analysis, HEC-RAS computes water surface profiles from downstream to upstream, requiring a known tailwater elevation as the starting boundary condition.
Question 74: Which of the following is a primary responsibility of floodplain management agencies?
- Coordinating flood risk reduction activities and enforcing regulations.
- Providing tax relief to flood-prone communities.
- Designing flood control dams.
- Providing grants for flood insurance coverage.
Floodplain management agencies are tasked with a broad range of activities focused on reducing flood risk. This includes coordinating various mitigation efforts, developing and implementing flood hazard reduction plans, and crucially, enforcing local and federal regulations that govern development in floodplains. Their role is to ensure a systematic approach to community safety and resilience against flood events.
Question 75: Which of the following is a requirement for floodplain management regulations under NFIP?
- Construction of levees in all flood zones.
- Participation in the NFIP and enforcement of local floodplain management regulations.
- Incentive-based approaches for floodplain development.
- Regulation of floodplain areas with no human activity.
A core requirement for communities participating in the NFIP is the adoption and enforcement of local floodplain management regulations. The Floodplain Administrator is the designated local official responsible for overseeing these regulations, including reviewing development permits, conducting inspections, and ensuring compliance to minimize flood risks within the community.
Question 76: How should hazardous conditions be handled during quality inspection work?
- Let someone else deal with it
- Stop work, secure the area, report the hazard, and follow safety protocols (Correct answer)
- Report hazards only at the end of the day
- Continue working if the hazard seems minor
Correct answer: Stop work, secure the area, report the hazard, and follow safety protocols
All hazardous conditions require immediate action: stop work, secure the area, report the hazard, and follow established safety protocols.
Question 77: Who is authorized to certify the elevation information on a FEMA Elevation Certificate?
- A licensed land surveyor, engineer, or architect authorized by state law (Correct answer)
- An insurance agent
- The property owner
- The local tax assessor
Correct answer: A licensed land surveyor, engineer, or architect authorized by state law
Only professionals licensed and authorized under state law to certify elevations may complete the elevation sections of the EC.
Question 78: A Letter of Map Amendment (LOMA) is used to remove a property from the SFHA when the property's lowest adjacent grade is:
- At the BFE
- Below the BFE
- One foot above the BFE
- At or above the BFE based on natural ground (Correct answer)
Correct answer: At or above the BFE based on natural ground
A LOMA amends the FIRM to remove a property naturally situated at or above the BFE that was inadvertently included in the SFHA.
Question 79: What inspection procedure is essential for environmental standards?
- Inspection is only needed for final sign-off
- Systematic inspection following established checklists and standards (Correct answer)
- Visual spot checks are sufficient
- The client determines inspection requirements
Correct answer: Systematic inspection following established checklists and standards
Systematic inspections using established checklists and industry standards ensure quality and compliance at every stage.
Question 80: What federal legislation established the National Flood Insurance Program (NFIP)?
- The Biggert-Waters Flood Insurance Reform Act of 2012
- The Flood Disaster Protection Act of 1973
- The National Flood Insurance Act of 1968 (Correct answer)
- The Robert T. Stafford Disaster Relief Act of 1988
Correct answer: The National Flood Insurance Act of 1968
The NFIP was created by the National Flood Insurance Act of 1968, which authorized the federal government to make flood insurance available to communities that adopt and enforce floodplain management regulations.
Question 81: What is the purpose of a Flood Insurance Rate Map (FIRM)?
- To map flood zones and areas with the risk of flooding.
- To define safe zones for people during disasters.
- To assess water quality in flood-prone areas.
- To define areas with high earthquake risk.
The Base Flood Elevation (BFE) represents the expected flood height for areas at risk of flooding during a 100-year flood event (a flood with a 1% chance of occurring in any given year). This elevation is a critical regulatory standard used in floodplain management to establish minimum elevation requirements for new construction and substantial improvements.
Question 82: In the Community Rating System, a Class 5 community gets what premium discount on policies in the SFHA?
- 25 percent (Correct answer)
- 10 percent
- 20 percent
- 15 percent
Correct answer: 25 percent
Each CRS class step is worth 5%, so Class 5 gets 25% off in the SFHA.
Question 83: Under the NFIP, what threshold defines 'substantial improvement' to a structure in a Special Flood Hazard Area?
- 75% of market value
- 50% of market value (Correct answer)
- 25% of market value
- 33% of market value
Correct answer: 50% of market value
Substantial improvement means any reconstruction, rehabilitation, or improvement whose cost equals or exceeds 50% of the structure's pre-improvement market value.
Question 84: A watershed with impervious surfaces increased from 10% to 40% will generally experience what change in peak runoff?
- Peak runoff increases only during 500-year events
- Peak runoff decreases due to increased infiltration
- Peak runoff increases due to reduced infiltration and faster response time (Correct answer)
- Peak runoff remains unchanged if detention is provided
Correct answer: Peak runoff increases due to reduced infiltration and faster response time
Increased impervious cover reduces infiltration and shortens time of concentration, resulting in higher and faster peak runoff from the same storm event.
Question 85: Which of the following is a structural floodplain mitigation technique?
- Emergency preparedness plans.
- Insurance programs for property owners.
- Floodplain zoning and land-use regulations.
- Floodwalls and levees.
Structural techniques involve physical barriers and modifications to the landscape to prevent or reduce flooding.
Question 86: Structural steel used below the BFE should be protected in what way?
- Protected against corrosion, such as by galvanizing or appropriate coatings (Correct answer)
- Wrapped in fiberglass insulation
- Painted with any latex coating
- Encased in gypsum board
Correct answer: Protected against corrosion, such as by galvanizing or appropriate coatings
Steel is acceptable below BFE when it is corrosion-protected, since floodwater accelerates rust.
Question 87: What is the required freeboard for new construction in a coastal Zone VE?
- One foot above BFE
- Three feet above BFE
- Two feet above BFE
- At or above BFE with no additional freeboard required by NFIP minimum standards (Correct answer)
Correct answer: At or above BFE with no additional freeboard required by NFIP minimum standards
NFIP minimum standards for Zone VE require the lowest horizontal structural member to be at or above the BFE; communities may adopt freeboard beyond the minimum.
Question 88: Which FEMA Hazard Mitigation Assistance program becomes available in a state only after a Presidential major disaster declaration?
- Flood Mitigation Assistance (FMA)
- Hazard Mitigation Grant Program (HMGP) (Correct answer)
- Community Rating System (CRS)
- Increased Cost of Compliance (ICC)
Correct answer: Hazard Mitigation Grant Program (HMGP)
HMGP funding is triggered by a Presidential major disaster declaration and is based on a percentage of disaster assistance.
Question 89: The '100-year flood' is best described as a flood that has a:
- 100-year return period with no annual variation
- 1% chance of being equaled or exceeded in any given year (Correct answer)
- Recurrence interval of exactly 100 years
- 1% chance of occurring once per century
Correct answer: 1% chance of being equaled or exceeded in any given year
The 100-year flood (Base Flood) has a 1% annual chance of being equaled or exceeded, meaning it can occur multiple times in any 100-year period.
Question 90: In a V zone, breakaway walls below the BFE must be constructed of what kind of materials?
- Any materials, since they will break away
- Flood damage-resistant materials designed to collapse under specified loads without damaging the elevated structure (Correct answer)
- Reinforced concrete designed to resist wave loads
- Gypsum board, to ensure easy failure
Correct answer: Flood damage-resistant materials designed to collapse under specified loads without damaging the elevated structure
Breakaway walls must use flood damage-resistant materials and be designed to fail under base flood conditions without harming the building.
Question 91: Which hydrologic method is most commonly used in FEMA flood studies to estimate peak discharge for small urban watersheds?
- Manning's Equation
- TR-55 (SCS Curve Number Method) (Correct answer)
- Rational Method
- Muskingum Routing
Correct answer: TR-55 (SCS Curve Number Method)
TR-55, developed by the USDA Soil Conservation Service, uses the Curve Number method to estimate runoff and peak discharge and is widely used in FEMA studies for small watersheds.
Question 92: In a regulatory floodway, development must be shown to cause what before it can be permitted?
- No more than a 1-foot increase in the BFE
- No increase in the base flood elevation (Correct answer)
- No change in the 500-year flood elevation
- No more than a 0.5-foot increase in the BFE
Correct answer: No increase in the base flood elevation
NFIP regulations prohibit floodway encroachments that would raise base flood levels, usually documented with a no-rise certification.
Question 93: What is the NFIP Emergency Program?
- Temporary housing assistance after floods
- The first phase of participation, offering limited coverage before a detailed FIRM is issued (Correct answer)
- A grant program for buying out flood-prone homes
- A program for rebuilding after a presidential disaster declaration
Correct answer: The first phase of participation, offering limited coverage before a detailed FIRM is issued
The Emergency Program gives limited amounts of insurance until FEMA finishes a detailed study and the community joins the Regular Program.
Question 94: The HEC-RAS software model is primarily used in flood studies to perform:
- Two-dimensional groundwater modeling
- Rainfall-runoff simulation
- Coastal wave height prediction
- One-dimensional steady and unsteady open-channel hydraulic analysis (Correct answer)
Correct answer: One-dimensional steady and unsteady open-channel hydraulic analysis
HEC-RAS (Hydrologic Engineering Center – River Analysis System) performs 1D and 2D steady and unsteady flow hydraulic analysis to compute water surface profiles.
Question 95: When a CLOMR proposes a floodway encroachment that would raise the BFE more than allowed, which requirement in 44 CFR 65.12 applies?
- Only a no-rise certification is needed
- The community must evaluate alternatives, notify affected owners, and adopt revised maps (Correct answer)
- A LOMA must be filed first
- The project is automatically approved if under 1.0 foot
Correct answer: The community must evaluate alternatives, notify affected owners, and adopt revised maps
Section 65.12 requires an alternatives evaluation, owner notification, and community concurrence before FEMA approves increases.
Question 96: Before a community allows a watercourse to be altered or relocated, the NFIP requires it to:
- Notify adjacent communities and the state coordinating agency and send evidence to FEMA (Correct answer)
- Publish a notice in the Federal Register
- Get a variance from the state legislature
- Hold a public referendum
Correct answer: Notify adjacent communities and the state coordinating agency and send evidence to FEMA
44 CFR 60.3(b)(6) requires notifying neighboring communities and the state, submitting evidence to FEMA, and keeping the channel's flood-carrying capacity.
Question 97: A homeowner wants to finish a below-BFE enclosure with carpet and padding, claiming the carpet can be replaced after a flood. Is this compliant?
- No, because carpet is not a flood damage-resistant material (Correct answer)
- Yes, if the carpet is synthetic
- Yes, because carpet is a removable finish
- No, unless the enclosure exceeds 300 square feet
Correct answer: No, because carpet is not a flood damage-resistant material
Carpet and padding are unacceptable below BFE because they require replacement after prolonged flooding.
Question 98: What environmental protection measure applies to material selection?
- Follow environmental rules only if specifically asked
- Environmental rules only apply to large corporations
- Proper handling, storage, and disposal of materials according to environmental regulations (Correct answer)
- Environmental concerns do not apply to this field
Correct answer: Proper handling, storage, and disposal of materials according to environmental regulations
Proper handling, storage, and disposal of all materials according to environmental regulations is a legal obligation in all trades.
Question 99: A community that fails to enforce NFIP floodplain management requirements may be placed on what status?
- Flood Hazard Watch
- Emergency Override
- Non-Participation Notice
- Probation or Suspension (Correct answer)
Correct answer: Probation or Suspension
Communities that fail to enforce NFIP requirements can be placed on probation (with a $50 surcharge on policies) or suspended from the NFIP entirely, which means federal flood insurance becomes unavailable to property owners.
Question 100: Which FEMA program delivers quality flood maps along with non-regulatory products such as depth grids and Changes Since Last FIRM to support risk communication?
- Risk MAP (Correct answer)
- Map Modernization (Map Mod)
- Community Rating System
- Hazard Mitigation Grant Program
Correct answer: Risk MAP
Risk MAP (Mapping, Assessment, and Planning) succeeded Map Mod and adds non-regulatory flood risk products.
Question 101: When a levee is shown on the FIRM as providing protection from the 1% annual chance flood, what accreditation standard must the levee meet under 44 CFR Part 65?
- Both B and C (Correct answer)
- The levee must have an active Operations, Maintenance, Inspection, and Emergency Action Plan
- The levee must be certified by the Army Corps of Engineers only
- The levee must meet FEMA freeboard and design criteria, including a minimum 3-foot freeboard above BFE
Correct answer: Both B and C
FEMA accreditation under 44 CFR Part 65 requires levees to meet design and freeboard criteria (including 3-foot freeboard) AND have documented operations, maintenance, inspection, and emergency action plans.
Question 102: What is the most critical safety requirement in technical measurements?
- Speed of completion
- Cost minimization
- Working alone to avoid delays
- Following all applicable safety regulations and wearing required PPE (Correct answer)
Correct answer: Following all applicable safety regulations and wearing required PPE
Safety regulations and proper PPE use are the most critical requirements in technical measurements to prevent injury and ensure compliance.
Question 103: What inspection procedure is essential for material selection?
- The client determines inspection requirements
- Visual spot checks are sufficient
- Systematic inspection following established checklists and standards (Correct answer)
- Inspection is only needed for final sign-off
Correct answer: Systematic inspection following established checklists and standards
Systematic inspections using established checklists and industry standards ensure quality and compliance at every stage.
Question 104: What is the primary goal of floodplain management administration?
- To conduct research on floodplain development.
- To enforce floodplain management regulations and reduce flood risk.
- To manage flood insurance programs.
- To promote floodplain construction for urban expansion.
Floodplain management administration involves the day-to-day operations and oversight of a community's floodplain program. Its primary goal is to ensure compliance with local, state, and federal floodplain regulations, thereby effectively reducing flood damage and protecting lives and property within flood-prone areas. This includes reviewing permits, providing guidance, and enforcing ordinances to minimize future losses.
Question 105: A remodel is considered a substantial improvement when its cost equals or exceeds what percentage of the structure's market value before the work starts?
- 50 percent (Correct answer)
- 75 percent
- 40 percent
- 25 percent
Correct answer: 50 percent
NFIP regulations define substantial improvement as work costing 50% or more of the structure's pre-improvement market value.
Question 106: Which zone designation indicates an area where flood hazards are possible but undetermined because no analysis has been conducted?
- Zone A
- Zone X (shaded)
- Zone D (Correct answer)
- Zone X (unshaded)
Correct answer: Zone D
Zone D is used for areas with possible but undetermined flood hazards.
Question 107: Which federal agency administers the National Flood Insurance Program?
- U.S. Geological Survey (USGS)
- U.S. Army Corps of Engineers
- Federal Emergency Management Agency (FEMA) (Correct answer)
- Department of Housing and Urban Development (HUD)
Correct answer: Federal Emergency Management Agency (FEMA)
FEMA administers the NFIP, which includes flood hazard mapping, floodplain management regulations, and the flood insurance program.
Question 108: Under NFIP, what is the minimum lowest floor elevation requirement for a new residential structure in Zone AE?
- At or above the Base Flood Elevation (Correct answer)
- Two feet above the Base Flood Elevation
- One foot above the Base Flood Elevation
- At or above the 500-year flood elevation
Correct answer: At or above the Base Flood Elevation
NFIP minimum standards require the lowest floor of new residential construction in Zone AE to be at or above the Base Flood Elevation, though communities may adopt higher freeboard standards.
Question 109: How should hazardous conditions be handled during safety procedures work?
- Let someone else deal with it
- Continue working if the hazard seems minor
- Stop work, secure the area, report the hazard, and follow safety protocols (Correct answer)
- Report hazards only at the end of the day
Correct answer: Stop work, secure the area, report the hazard, and follow safety protocols
All hazardous conditions require immediate action: stop work, secure the area, report the hazard, and follow established safety protocols.
Question 110: Which of the following accessory structures may qualify for a variance to be constructed below BFE in an SFHA?
- A guesthouse used for overnight stays
- A detached garage with a habitable loft
- A detached garage used for storage that is non-habitable (Correct answer)
- A pool house with a bathroom
Correct answer: A detached garage used for storage that is non-habitable
Small non-habitable accessory structures such as detached garages used solely for storage may qualify for a variance but must be flood-proofed and anchored.
Question 111: Which vertical datum is used on most modern FEMA FIRMs?
- NAD 83
- NAVD 88 (Correct answer)
- NGVD 29
- WGS 84
Correct answer: NAVD 88
Modern FIRMs reference the North American Vertical Datum of 1988.
Question 112: In hydraulic analysis, Manning's Equation is used to calculate:
- Open-channel flow velocity and discharge (Correct answer)
- Rainfall runoff volume
- Sediment transport rates
- Time of concentration
Correct answer: Open-channel flow velocity and discharge
Manning's Equation relates channel geometry, roughness coefficient (n), hydraulic radius, and slope to compute average flow velocity and discharge in open channels.
Question 113: Which masonry product is acceptable below the BFE?
- Concrete masonry units (CMU) (Correct answer)
- Masonry with lime-only mortar exposed to saltwater
- Gypsum block
- Unfired clay adobe
Correct answer: Concrete masonry units (CMU)
Concrete block and brick with appropriate mortar withstand prolonged flood contact.
Question 114: What is the role of a floodplain management plan?
- To guide actions to prevent flood damage and reduce risk.
- To develop infrastructure projects for flood-prone areas.
- To direct property owners to flood insurance programs.
- To assess the feasibility of floodplain buyouts.
A floodplain management plan is a comprehensive document that outlines a community's strategies and policies for managing floodplains. Its core purpose is to identify flood hazards, assess risks, and establish a framework of actions, regulations, and projects aimed at preventing future flood damage and reducing overall flood risk to life and property. It serves as a blueprint for coordinated efforts across various community sectors.
Question 115: Which mitigation technique is generally NOT permitted to bring a substantially improved residential building in an A zone into NFIP compliance?
- Elevation on compacted fill
- Dry floodproofing (Correct answer)
- Relocation outside the floodplain
- Elevation on an extended foundation
Correct answer: Dry floodproofing
Dry floodproofing satisfies NFIP requirements only for nonresidential buildings, unless the community has a FEMA-approved basement exception.
Question 116: What code compliance requirement applies to environmental standards?
- Follow codes only when inspectors are present
- Code compliance only matters for commercial projects
- Codes are guidelines, not requirements
- All work must comply with applicable local, state, and national codes (Correct answer)
Correct answer: All work must comply with applicable local, state, and national codes
Code compliance is mandatory for all work, ensuring safety, quality, and legal adherence.
Question 117: What is the primary purpose of a 'No-Rise Certification' in floodway encroachment analysis?
- To confirm that a FIRM revision is not needed
- To certify that a property is naturally above the BFE
- To certify that a new structure will not sink into saturated soils
- To demonstrate that proposed development will not increase the BFE in the floodway (Correct answer)
Correct answer: To demonstrate that proposed development will not increase the BFE in the floodway
A No-Rise Certification, sealed by a licensed engineer, verifies that proposed floodway encroachment will not cause any increase in BFE based on hydraulic modeling.
Question 118: What is the purpose of floodplain mitigation?
- To reduce the impacts of flooding through planning and engineering solutions.
- To encourage floodplain development for economic growth.
- To flood coastal areas for water storage.
- To increase the size of floodplains for agricultural use.
Floodplain zoning and land-use regulation is a common non-structural floodplain mitigation technique. It involves establishing rules for how land within floodplains can be developed and used, guiding construction away from high-risk areas or ensuring it is built to withstand flood hazards, thereby reducing future flood losses.
Question 119: Which insulation is generally UNACCEPTABLE below the BFE?
- Fiberglass batt insulation (Correct answer)
- Closed-cell spray polyurethane foam
- Extruded polystyrene board
- Foam glass insulation
Correct answer: Fiberglass batt insulation
Fiberglass batts absorb and hold water, so they must be removed and replaced after flooding.
Question 120: A property owner wants to enclose the area below the BFE in an elevated Zone AE structure. What is the maximum allowable use of that enclosed area?
- Storage, parking, and building access only (Correct answer)
- Any use approved by the local floodplain administrator
- Storage and a home office
- Any use as long as flood vents are installed
Correct answer: Storage, parking, and building access only
Enclosed areas below the BFE in elevated buildings must be used only for parking of vehicles, building access, and storage—not for habitation or utilities except those flood-proofed.
Certified Floodplain Manager (CFM) Exam
The CFM exam certifies professionals who demonstrate knowledge and experience in floodplain management, including regulations, natural functions, and mitigation strategies.
Exam Rules
- You can skip questions and return to them later
- Flag questions for review before submitting
- No feedback shown until you submit the entire exam
- Unanswered questions count as wrong — answer everything
- 10 pretest questions are mixed in and don't affect your score
- Timer auto-submits when time runs out
- Your progress is auto-saved every 30 seconds
Practice questions written with AI assistance and published by Nathan Beja, founder of Practice Test Geeks. They are not real exam questions. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- illinoisfloods.org — Fees, test delivery, exam information · verified Nov 2026
- floods.org — Late registration, eligibility, fees, exam format, passing score, renewal, retake fee, retake policy, score release, time limit · verified Nov 2026