  1. During a post-storm inspection, which condition would most urgently require immediate corrective action documentation?

    Answer: Silt fence failure with visible sediment discharge reaching a waterway

    Sediment discharge reaching a waterway constitutes an active violation requiring immediate corrective action and documentation.

  2. What is the primary purpose of documenting the date and time on inspection reports?

    Answer: To establish a legal record and correlate findings with weather events

    Date and time stamps create a legal record and allow correlation of findings with rainfall events, which is critical for regulatory compliance.

  3. When inspecting a site with multiple phases of construction, what is the most important organizational step before beginning the walkthrough?

    Answer: Review the SWPPP to understand the planned BMP layout for each active phase

    Reviewing the SWPPP before the walkthrough ensures the inspector knows what BMPs should be in place for each phase and can identify omissions.

  4. An inspector observes a check dam in a drainage channel that is partially buried by sediment to within 2 inches of the overflow notch. What is the appropriate finding?

    Answer: The check dam must be cleaned out to restore capacity before the next storm

    When sediment reaches within 50% of the overflow notch capacity, the check dam must be cleaned out to restore its sediment-trapping function before the next storm.

  5. Which of the following is considered a 'qualified inspector' for NPDES construction general permit inspections in most US states?

    Answer: A person knowledgeable in the principles of erosion and sediment control and familiar with the CGP requirements

    Most CGPs require inspections by a person with knowledge of erosion/sediment control principles and familiarity with the permit, not necessarily a licensed PE.

  6. When measuring turbidity at a stormwater discharge point, what unit is commonly used to report results?

    Answer: Nephelometric Turbidity Units (NTU)

    NTU (Nephelometric Turbidity Units) is the standard unit for turbidity measurements in stormwater monitoring and compliance reporting.

  7. A site inspector finds that inlet protection around a storm drain has been removed by the contractor to allow equipment access. What is the correct response?

    Answer: Document the deficiency, require immediate reinstallation, and note a corrective action deadline

    Removed BMPs must be documented as a deficiency with a required corrective action deadline to maintain the compliance record.

  8. Under the EPA's Construction General Permit (CGP), how soon after a qualifying storm event must an inspection be completed?

    Answer: Within 72 hours of the storm ending

    The EPA CGP requires post-storm inspections to be completed within 72 hours after the end of a qualifying storm event of 0.25 inches or more.

  9. Which area of a construction site typically receives the most scrutiny during a site inspection for sediment loss?

    Answer: Downslope perimeter controls and discharge points

    Downslope perimeter controls and discharge points are where sediment leaves the site, making them the highest-priority inspection locations.

  10. What is the recommended minimum slope for a gravel construction entrance/exit pad to promote vehicle tire cleaning?

    Answer: 1-2% toward the site interior to prevent tracking toward the road

    A slight 1-2% slope toward the site interior helps direct drainage away from the public road and encourages tire cleaning as vehicles depart.

  11. When inspecting silt fence, which defect indicates that the fence is likely to fail hydraulically during a storm?

    Answer: Geotextile fabric is torn at a post connection point allowing a gap

    Tears in the geotextile fabric at post connections create gaps through which sediment-laden water can flow unfiltered, representing a critical failure point.

  12. During a dry-weather inspection, an inspector notices a trickle of murky water flowing from a storm drain that is not connected to any known dewatering activity. What should the inspector do first?

    Answer: Trace the flow upstream to identify the illicit discharge source and document findings

    Dry-weather flows of turbid water suggest an illicit discharge, which must be traced to its source and documented for reporting under the SWPPP.

  13. What is the purpose of recording the name and signature of the inspector on every inspection report?

    Answer: To certify that the inspection was conducted by a qualified individual and the information is accurate

    Inspector signature certifies that the inspection was conducted by a qualified person and that the reported information is accurate, which is a legal certification.

  14. A bioretention cell on a construction site is filling with sediment during the construction phase. What is the standard practice to protect it?

    Answer: Install temporary bypass measures to divert construction runoff around it until the site is stabilized

    Permanent stormwater features like bioretention cells should be bypassed or protected during construction to prevent premature clogging with construction sediment.

  15. Which condition would cause an inspector to classify a sediment basin as non-functional?

    Answer: Sediment accumulation reaching one-third of the basin's design storage capacity

    Most design standards require sediment basins to be cleaned when sediment accumulates to one-third of the design storage volume to maintain treatment capacity.

  16. What documentation must be retained on-site or made available during a regulatory inspection under the EPA CGP?

    Answer: The SWPPP, all inspection reports, and records of corrective actions

    The CGP requires that the SWPPP, all inspection reports, and corrective action records be retained and made available to regulators upon request.

  17. An inspector finds that a slope with disturbed soil has been left un-stabilized for 20 days without any temporary cover. The applicable CGP requires stabilization within 14 days. How should this be documented?

    Answer: As a corrective action item with the number of days past the stabilization deadline noted

    Exceeding the stabilization deadline is a permit violation that must be documented as a corrective action item, including the number of days the deadline has been exceeded.

  18. What is the purpose of a 'stabilized construction exit' at a site perimeter?

    Answer: To remove sediment and mud from vehicle tires before they access public roadways

    Stabilized exits use aggregate or other materials to dislodge and trap sediment from vehicle tires, preventing tracking of mud onto public roads.

  19. When evaluating the effectiveness of hydroseeding applied to a disturbed area, what is the minimum percent vegetative cover typically required before an area is considered 'finally stabilized'?

    Answer: 70% cover of native or non-invasive vegetation

    The EPA CGP defines final stabilization as achieving 70% vegetative cover of native or non-invasive species over all disturbed areas.

  20. During an inspection, a contractor claims that a BMP was installed correctly but a recent storm damaged it before the inspector's visit. What is the appropriate inspection response?

    Answer: Document the current condition as a deficiency and require corrective action regardless of cause

    Inspectors must document conditions as found; storm damage does not exempt a site from corrective action requirements since BMPs must be maintained to function during future storms.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. envirocert.org — Eligibility, fees, renewal, score validity, test delivery, score release, retake fee · verified Nov 2026