Erosion & Sediment Control Principles Flashcards
21 cards from real CESSWI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 20 Erosion & Sediment Control Principles flashcards as text
Which factor in the RUSLE equation accounts for the ability of soil to resist detachment and transport by rainfall?
Answer: K factor (soil erodibility)
The K factor in RUSLE represents soil erodibility, reflecting the soil's susceptibility to detachment and transport by rainfall and runoff.
A contractor installs a silt fence parallel to the slope contours on a 15% grade. What is the primary concern with this installation?
Answer: Silt fence is not recommended for slopes exceeding 10%
Silt fences are generally not recommended on slopes steeper than 10% because concentrated flow can overwhelm the barrier and cause failure.
During a post-storm inspection, an inspector finds that a sediment basin outlet riser pipe is submerged and the basin is overtopping the embankment. What is the most likely cause?
Answer: Inadequate principal spillway capacity for the storm event
Overtopping an embankment during a storm typically indicates the principal spillway was undersized and cannot convey the runoff generated by that event.
Which erosion mechanism involves the removal of a thin, relatively uniform layer of soil from the land surface by raindrop splash and sheet flow?
Answer: Sheet erosion
Sheet erosion removes a thin, fairly uniform layer of soil across a broad area through the combined action of raindrop impact and shallow overland flow.
A SWPPP requires a sediment trap to be sized for a drainage area of 2 acres. Using a volumetric standard of 1,800 cubic feet per acre, what minimum storage volume is required?
Answer: 3,600 cubic feet
Multiplying the 2-acre drainage area by 1,800 cubic feet per acre yields a required storage volume of 3,600 cubic feet.
Which of the following best describes the purpose of an anti-seep collar on a sediment basin outlet barrel?
Answer: To lengthen the seepage path and reduce piping failure risk
Anti-seep collars extend the seepage path along the outside of the barrel through the embankment, reducing hydraulic gradient and the risk of internal erosion (piping).
A construction site experiences a severe rain event that causes sediment to discharge into an adjacent stream. Under NPDES permit conditions, what is the operator's immediate obligation?
Answer: Document the event and notify the permitting authority within the required timeframe
NPDES permits typically require operators to document unauthorized discharges and report them to the permitting authority within a specified timeframe (often 24–72 hours).
What is the primary function of a check dam installed in a drainage swale on a construction site?
Answer: To reduce flow velocity and promote sediment deposition within the swale
Check dams slow water velocity within the swale, encouraging sediment to settle out before runoff reaches a receiving water body.
Under the RUSLE model, increasing the slope length (L factor) while keeping all other factors constant will have what effect on predicted soil loss?
Answer: Soil loss increases because longer slopes accumulate more runoff
Greater slope length allows runoff to accumulate and gain erosive energy, resulting in higher predicted soil loss when other RUSLE factors are held constant.
Which cover practice provides the most immediate and effective temporary erosion protection on a freshly graded slope?
Answer: Installation of erosion control blankets (ECBs)
Erosion control blankets provide immediate physical protection by absorbing raindrop energy and holding soil particles in place from the moment of installation.
A site inspector observes clear water flowing through a silt fence while turbid water pools behind it. What does this indicate about the silt fence's performance?
Answer: The silt fence is functioning correctly by filtering sediment from the runoff
Clear water passing through while turbid water ponds behind indicates the silt fence fabric is trapping sediment particles as intended.
Which soil texture is generally considered the most erodible under typical rainfall conditions?
Answer: Silt loam
Silt loam soils have high erodibility because silt particles are easily detached by raindrop impact and transported in suspension with minimal cohesion.
A SWPPP calls for a concrete washout area to be located at least how far from storm drains, open ditches, and water bodies under typical EPA guidance?
Answer: 50 feet
EPA's Construction General Permit guidance and most state standards require concrete washout facilities to be located at least 50 feet from storm drains, ditches, and surface waters.
During a dry-season inspection on a site with established temporary seeding, an inspector finds bare patches with rill formation. What is the MOST appropriate corrective action?
Answer: Reseed the bare areas and apply erosion control blankets to protect them
Reseeding and applying ECBs addresses both the immediate erosion risk and the underlying lack of vegetative cover causing the bare patches.
What is the primary reason that compacted construction site soils typically generate more runoff than undisturbed soils?
Answer: Compaction reduces macropore space, decreasing infiltration capacity
Soil compaction collapses macropores and reduces infiltration capacity, causing more precipitation to become overland flow rather than infiltrating.
A stabilized construction entrance is primarily designed to accomplish which of the following?
Answer: Remove mud and debris from vehicle tires before they exit onto public roads
Stabilized construction entrances use coarse aggregate to dislodge mud and debris from vehicle tires, preventing tracking of sediment onto adjacent public roadways.
Which of the following best describes the concept of 'phased grading' as an erosion control strategy?
Answer: Limiting the area of disturbance at any given time to reduce exposed soil
Phased grading minimizes the area of disturbed soil exposed at any one time, directly reducing the source of erosion on a construction site.
An inspector notices that a fiber roll (wattle) installed on a slope has separated from the soil surface, leaving a gap underneath. What is the most likely consequence?
Answer: Runoff will flow under the wattle, bypassing the sediment control barrier
A gap between the fiber roll and the soil surface allows runoff to bypass the barrier entirely, negating its sediment control function.
Under what condition is a sediment basin REQUIRED rather than a sediment trap for construction site stormwater management?
Answer: When the contributing drainage area exceeds 10 acres
Common standards require a sediment basin when the contributing drainage area exceeds 10 acres because sediment traps lack sufficient storage and retention capacity for larger watersheds.
Which SWPPP element is specifically designed to track the installation, maintenance, and removal of each BMP on a construction site over time?
Answer: BMP inspection log
A BMP inspection log provides a chronological record of each control measure's installation date, condition during inspections, maintenance performed, and eventual removal.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- envirocert.org — Eligibility, fees, renewal, score validity, test delivery, score release, retake fee · verified Nov 2026