Regulations and Compliance Flashcards

21 cards from real CESSWI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 20 Regulations and Compliance flashcards as text
  1. Under the Clean Water Act Section 402, which program specifically governs stormwater discharges from construction sites?

    Answer: National Pollutant Discharge Elimination System (NPDES)

    The NPDES program under CWA Section 402 regulates point source discharges including stormwater from construction activities.

  2. A construction site disturbing 0.8 acres is located in a state that has been authorized by EPA to administer its own NPDES program. Which permit authority applies?

    Answer: The state issues its own equivalent permit under state authority

    In states with EPA-authorized NPDES programs, the state administers its own stormwater permits and the state permit applies.

  3. Which EPA Phase II rule expanded NPDES stormwater permit requirements to include construction sites of what minimum acreage?

    Answer: 1 acre or more

    The EPA Phase II stormwater rule (effective 2003) extended permit requirements to construction sites disturbing 1 acre or more.

  4. What is the primary purpose of a Stormwater Pollution Prevention Plan (SWPPP) under the Construction General Permit?

    Answer: To document BMPs and site conditions to prevent pollutant discharge

    A SWPPP identifies BMPs and site-specific measures to prevent stormwater pollution from reaching waters of the United States.

  5. Under the EPA Construction General Permit, operators must conduct routine inspections of BMPs at least how frequently during active construction?

    Answer: Every 14 calendar days and within 24 hours of a 0.25-inch rain event

    The EPA CGP requires inspections every 14 days and within 24 hours of a qualifying storm event to verify BMP effectiveness.

  6. Which of the following is NOT typically required to be included in a SWPPP?

    Answer: Contractor's liability insurance certificate

    Insurance certificates are not a SWPPP regulatory requirement; the plan must address pollution prevention, not contractor finances.

  7. When a construction project is complete and all areas are stabilized, what must the permit holder file to terminate NPDES permit coverage?

    Answer: A Notice of Termination (NOT)

    A Notice of Termination (NOT) is submitted to the permitting authority once the site is stabilized and permit coverage is no longer needed.

  8. Under the CWA, 'waters of the United States' (WOTUS) is important because it defines the geographic scope of which regulatory program?

    Answer: NPDES permit jurisdiction and Section 404 wetland permits

    WOTUS defines which water bodies fall under federal CWA jurisdiction, triggering NPDES and Section 404 permit requirements.

  9. A contractor installs a concrete washout area on-site without any liner. Which regulatory concern does this most directly trigger?

    Answer: Potential unpermitted discharge of pH-elevated wastewater to stormwater

    Unlined concrete washouts can leach alkaline wastewater into stormwater, constituting an unpermitted pollutant discharge under NPDES.

  10. Section 404 of the Clean Water Act requires a permit from the U.S. Army Corps of Engineers (USACE) for which activity?

    Answer: Discharge of dredged or fill material into waters of the United States

    Section 404 permits issued by USACE are required for discharging dredged or fill material into jurisdictional waters and wetlands.

  11. What does a Total Maximum Daily Load (TMDL) establish for an impaired water body?

    Answer: The maximum amount of a pollutant a water body can receive and still meet water quality standards

    A TMDL sets the maximum pollutant load a water body can assimilate while still meeting applicable water quality standards.

  12. A CESSWI inspector discovers that a permitted construction site is discharging turbid stormwater directly to a stream without functional BMPs. What is the most appropriate immediate action?

    Answer: Document the violation, notify the site operator, and report to the permitting authority

    Inspectors document noncompliance and notify operators and the regulatory authority; federal enforcement authority rests with the permitting agency, not the inspector.

  13. Which federal agency has primary enforcement authority for NPDES violations at construction sites in states without authorized NPDES programs?

    Answer: U.S. Environmental Protection Agency (EPA)

    EPA retains direct NPDES enforcement authority in states that have not received EPA authorization to administer their own permit programs.

  14. Under the EPA Construction General Permit, which of the following pollutants from construction sites requires specific BMP controls beyond sediment?

    Answer: Concrete washout, paint, and fuel stored on site

    The CGP requires BMPs to address non-sediment pollutants including concrete washout, fuels, oils, paints, and other chemicals stored or used on site.

  15. A state requires that construction sites implement post-construction stormwater controls as a condition of local land development approval. This requirement is most directly associated with which federal mandate?

    Answer: NPDES Phase II stormwater rules requiring local MS4 programs to include post-construction standards

    Phase II NPDES rules require Municipal Separate Storm Sewer System (MS4) programs to establish post-construction stormwater management standards for new development.

  16. Which document must a construction operator file BEFORE earth disturbance begins at a site requiring NPDES permit coverage?

    Answer: Notice of Intent (NOI)

    Operators must file a Notice of Intent (NOI) to be covered under the Construction General Permit before disturbing any earth.

  17. Under most state construction general permits, what is the maximum allowable turbidity or visual benchmark that inspectors use to evaluate whether a BMP is functioning effectively?

    Answer: Discharge must not cause a discernible change in the color or clarity of the receiving water

    Many permits use narrative standards prohibiting discharges that cause a discernible change in color or clarity of receiving waters as the visual benchmark.

  18. When multiple operators share responsibility on a single construction site under a Construction General Permit, how is permit responsibility typically allocated?

    Answer: Each operator with operational control over a portion of the site may need separate or co-permittee coverage

    Operators with day-to-day operational control over site activities may each require permit coverage or be named as co-permittees.

  19. A construction site inspector finds that rain gauge records show a 0.3-inch storm occurred 20 hours ago, but no post-storm BMP inspection was conducted. Under the EPA CGP, this is a violation because:

    Answer: Inspections are required within 24 hours of a storm producing 0.25 inches or more of rainfall

    The EPA CGP requires inspections within 24 hours of a storm event that produces 0.25 inches or more of rainfall.

  20. Which of the following best describes an 'operator' as defined under NPDES construction stormwater regulations?

    Answer: Any entity with operational control over daily activities or the ability to modify plans/specifications

    An 'operator' is any entity that has operational control over construction activities or control over the project's plans and specifications.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. envirocert.org — Eligibility, fees, renewal, score validity, test delivery, score release, retake fee · verified Nov 2026