A planner wants to validate the master production schedule against key bottleneck resources before running MRP. Which technique is most appropriate?
Answer: Rough-cut capacity planning
Rough-cut capacity planning checks the MPS against critical resources before detailed MRP is run.
Capacity requirements planning (CRP) differs from rough-cut capacity planning mainly because CRP uses which input?
Answer: MRP planned orders and open shop orders with routings
CRP calculates detailed work-center load from MRP planned orders, open orders, and routings.
In drum-buffer-rope scheduling under the theory of constraints, what does the 'drum' represent?
Answer: The pace set by the constraint resource
The drum is the constraint's schedule, which sets the pace for the whole system.
A customer service rep needs to know how many units of an item can be committed to new orders in a given period. Which MPS output answers this?
Answer: Available-to-promise
Available-to-promise is the uncommitted portion of inventory and planned production available for new customer orders.
Inside the demand time fence, the MPS projected available balance is typically calculated using which demand?
Answer: Customer orders only
Inside the demand time fence, forecast is usually ignored and only actual customer orders drive the calculation.
A shortage of a purchased component appears in MRP. Which feature lets the planner trace that requirement back to the parent orders that caused it?
Answer: Pegging
Pegging links component requirements to their sources of demand in higher-level items.
Why does MRP assign a low-level code to each item in the bill of material?
Answer: So each item is netted only once, at its lowest BOM level
Low-level coding delays netting until all gross requirements from every parent are accumulated.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- ascm.org — Renewal, score validity, retake policy, score release, test delivery, exam format, passing score, retake fee, test dates, eligibility · verified Nov 2026