← All CSCP Flashcard Decks

CSCP Supply Chain Technology and Systems Flashcards

7 cards from real CSCP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 CSCP Supply Chain Technology and Systems flashcards as text
  1. A manufacturer's ERP plans production without considering actual machine capacity, causing frequent schedule overloads. Which system is best suited to generate finite-capacity, constraint-based schedules?

    Answer: Advanced planning and scheduling (APS) system

    APS systems use constraint-based optimization to build finite-capacity plans and schedules that traditional ERP MRP logic, which assumes infinite capacity, cannot.

  2. Which system sits between ERP and plant-floor equipment to track work-in-process, labor, and quality data in real time?

    Answer: Manufacturing execution system (MES)

    An MES executes and monitors production on the shop floor, bridging ERP plans and actual operations.

  3. A retailer wants suppliers to replenish its stock automatically based on shared point-of-sale and inventory data. Which arrangement does this describe?

    Answer: Vendor-managed inventory (VMI)

    In VMI the supplier uses the customer's shared demand and inventory data to make replenishment decisions.

  4. What is the PRIMARY advantage of passive RFID over traditional bar codes in a distribution center?

    Answer: Multiple items can be read at once without line-of-sight

    RFID enables simultaneous, non-line-of-sight reading of many tags, speeding receiving and counting.

  5. Two trading partners exchange purchase orders, advance ship notices, and invoices in a standardized computer-to-computer format. Which technology are they using?

    Answer: Electronic data interchange (EDI)

    EDI uses standards such as ANSI X12 or EDIFACT to exchange business documents directly between computer systems.

  6. A company creates a virtual, continuously updated model of its supply network to simulate the effect of a port closure before it happens. What is this model called?

    Answer: Digital twin

    A digital twin is a dynamic virtual replica of physical assets or networks used for monitoring and what-if simulation.

  7. Before integrating a new ERP, a firm discovers the same supplier listed under five different IDs. Which discipline addresses this problem?

    Answer: Master data management

    Master data management establishes a single, accurate, governed version of core records such as suppliers, items, and customers.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. ascm.org — Renewal, score validity, retake policy, score release, test delivery, exam format, passing score, retake fee, test dates, eligibility · verified Nov 2026