According to OSHA 29 CFR 1926.850(a), what must be completed before any demolition work begins?
-
A
Site grading plan submitted to the local authority
-
B
Engineering survey of the structure by a competent person
-
C
Asbestos abatement of all materials
-
D
Installation of perimeter fencing