CBP Cheat Sheet 2026
The 30 highest-yield CBP facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.
100 questions
120 min time limit
75.00% to pass
- What is a mechanic's lien in the context of construction? → A legal claim against a property by unpaid contractors or suppliers
- What inspection procedure is essential for quality inspection? → Systematic inspection following established checklists and standards
- In a unit price contract, how is the total contract price determined? → By multiplying the agreed unit price for each item by the actual quantities installed
- When a subcontractor identifies a conflict between the project drawings and specifications, the appropriate action for the GC is to: → Submit a request for information (RFI) to the design team for an official clarification
- How should hazardous conditions be handled during material selection work? → Stop work, secure the area, report the hazard, and follow safety protocols
- What does an indemnification clause in a construction contract typically require? → One party to protect and hold harmless another party from specified liabilities or claims
- A 'scope gap' in subcontracting refers to a situation where: → Work required by the contract is excluded from all subcontractor bids
- What is a change order in a construction contract? → A written amendment modifying the original contract scope, price, or schedule
- How should equipment be maintained for safety procedures operations? → Follow manufacturer-recommended preventive maintenance schedules
- What environmental protection measure applies to equipment operation? → Proper handling, storage, and disposal of materials according to environmental regulations
- Which factor is critical in maintaining cost control throughout a project? → Ongoing cost tracking and budget review
- How should equipment be maintained for environmental standards operations? → Follow manufacturer-recommended preventive maintenance schedules
- Which of the following amounts is typically withheld from each subcontractor progress payment as financial security to ensure project completion? → Retainage
- Which document outlines the step-by-step process for executing a construction project? → Execution plan
- What is the primary purpose of a site-specific safety plan? → Ensure site hazards are addressed properly
- What environmental protection measure applies to quality inspection? → Proper handling, storage, and disposal of materials according to environmental regulations
- Which type of hazard does a fall protection system primarily address? → Falls from heights
- What environmental protection measure applies to safety procedures? → Proper handling, storage, and disposal of materials according to environmental regulations
- Which tool is most commonly used for scheduling in construction projects? → Gantt charts
- Which document legally binds a contractor to perform specific work for an agreed-upon price and timeline? → Construction contract
- What environmental protection measure applies to maintenance protocols? → Proper handling, storage, and disposal of materials according to environmental regulations
- What is 'bid leveling' in the subcontractor selection process? → Adjusting received bids to a common scope basis so they can be fairly compared
- A subcontractor who consistently fails to maintain the project schedule and causes delays to other trades may be subject to: → Assessment of liquidated damages as defined in the subcontract agreement
- What is the primary purpose of a Certificate of Occupancy (CO)? → To certify that a building meets code requirements and is safe for occupancy
- How should hazardous conditions be handled during safety procedures work? → Stop work, secure the area, report the hazard, and follow safety protocols
- What environmental protection measure applies to environmental standards? → Proper handling, storage, and disposal of materials according to environmental regulations
- How should equipment be maintained for technical measurements operations? → Follow manufacturer-recommended preventive maintenance schedules
- What is retainage in a construction contract? → A percentage of each payment withheld by the owner until project completion
- How should equipment be maintained for equipment operation operations? → Follow manufacturer-recommended preventive maintenance schedules
- How often are building codes updated? → Every 3 years
Turn these facts into recall: