Work Rate Flashcards

6 cards from real BARB practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Work Rate flashcards as text
  1. A pump fills a tank at 50 litres per minute. The tank holds 1,500 litres. How long to fill it?

    Answer: 30 minutes

    Time = 1,500 ÷ 50 = 30 minutes.

  2. Soldier A paints 3 rooms per day and Soldier B paints 2 rooms per day. How many days to paint 20 rooms together?

    Answer: 4 days

    Combined rate = 5 rooms/day; Days = 20 ÷ 5 = 4 days.

  3. A generator produces 200 kW of power per hour. How many hours to produce 1,400 kW?

    Answer: 7 hours

    Time = 1,400 ÷ 200 = 7 hours.

  4. Two teams together complete a construction task in 6 hours. Team A alone takes 10 hours. How long would Team B take alone?

    Answer: 15 hours

    Combined rate = 1/6; A's rate = 1/10; B's rate = 1/6 − 1/10 = 5/30 − 3/30 = 2/30 = 1/15; B takes 15 hours.

  5. A soldier sorts 90 documents in 1.5 hours. How many documents per minute is that?

    Answer: 1 per minute

    90 documents ÷ 90 minutes = 1 document per minute.

  6. What does the BARB Work Rate subtest assess?

    Answer: Ability to solve problems involving output, time, and workers

    The Work Rate subtest measures your ability to calculate how quickly individuals or teams complete tasks.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. practicequestions.mindmill.co.uk — Exam format · verified Oct 2026
  2. jobs.army.mod.uk — Test delivery, score release · verified Oct 2026