Six Sigma Green Belt Flashcards
7 cards from real ASQ practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Six Sigma Green Belt flashcards as text
A Green Belt wants to test whether there is a significant difference in mean cycle times between three machine types. Which statistical test is most appropriate?
Answer: One-way ANOVA
One-way ANOVA compares means across three or more groups simultaneously, making it appropriate for comparing cycle times among three machine types.
What is the purpose of a process capability index (Ppk) as distinct from Cpk?
Answer: Ppk uses overall process variation while Cpk uses within-subgroup short-term variation
Ppk uses total (long-term) standard deviation including all sources of variation, while Cpk uses within-subgroup (short-term) variation representing process entitlement.
In a control chart, what does an 'out-of-control' signal indicate?
Answer: A special cause of variation is likely present
An out-of-control signal on a control chart indicates a statistically unusual pattern suggesting a special (assignable) cause of variation is present.
Which lean tool is used to visually map the flow of materials and information to identify waste and non-value-added activities?
Answer: Value Stream Mapping (VSM)
Value Stream Mapping creates a visual representation of the entire process flow, highlighting waste, delays, and non-value-added steps that are candidates for elimination.
A team applies the 5 Whys technique. What is the main risk of this analysis method?
Answer: It can lead to different root causes depending on who is asking the questions
The 5 Whys is vulnerable to subjective bias since different teams may trace different causal chains from the same symptom, potentially reaching different root causes.
What does 'measurement system bias' mean in the context of a Gage R&R study?
Answer: The measurement system consistently reads higher or lower than the true value
Bias is a systematic offset between the measurement system's average reading and the true reference value, indicating a calibration issue.
In the Control phase, which document defines the actions to take if a process goes out of control?
Answer: Control plan
The control plan specifies monitoring methods, control limits, response plans, and responsible parties for sustaining process improvements.
How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- asq.org — Eligibility, fees, exam format, registration deadline, retake fee, test dates, score release, test delivery, score validity, passing score · verified Oct 2026