Which document specifies the dimensional, material, and functional requirements that a product must meet?
Answer: Engineering drawing / specification
Engineering drawings and specifications define the required dimensions, tolerances, materials, and functional characteristics that a product must conform to.
A process produces 45 defects out of 1,000 opportunities. What is the defects per million opportunities (DPMO)?
Answer: 45,000
DPMO = (defects / opportunities) × 1,000,000 = (45 / 1,000) × 1,000,000 = 45,000.
In FMEA, the Risk Priority Number (RPN) is calculated as:
Answer: Severity × Occurrence × Detection
RPN = Severity × Occurrence × Detection, and it is used to prioritize failure modes for corrective action.
Which of the following best describes 'calibration' of a measurement instrument?
Answer: Comparing the instrument's measurements to a known reference standard
Calibration is the process of comparing an instrument's readings to a known reference standard to determine its accuracy and identify any bias.
What is the purpose of a corrective action?
Answer: To prevent a problem from recurring by eliminating its root cause
Corrective action aims to permanently eliminate the root cause of a nonconformance to prevent recurrence.
Which chart would be most appropriate when monitoring the proportion of defective items in samples of equal size?
Answer: p-chart
The p-chart monitors the proportion (fraction) defective and can be used with both equal and unequal sample sizes.
In ISO 9001:2015, what is the focus of the 'risk-based thinking' requirement?
Answer: Considering risks and opportunities when planning and implementing the QMS
ISO 9001:2015 requires organizations to consider risks and opportunities proactively throughout their QMS planning and operations rather than eliminating all risk.
How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- asq.org — Eligibility, fees, exam format, registration deadline, retake fee, test dates, score release, test delivery, score validity, passing score · verified Oct 2026