Lean Quality Management Flashcards

6 cards from real ASQ practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Lean Quality Management flashcards as text
  1. 'Kanban' in a lean system is primarily used to:

    Answer: Signal the need to produce or replenish items based on actual consumption — a pull signal

    Kanban is a visual signaling system that triggers production or replenishment only when needed, supporting a pull-based flow that reduces overproduction and inventory.

  2. 'Single-piece flow' (one-piece flow) is preferred in lean because:

    Answer: It reduces lead time, exposes problems immediately, and improves quality by processing items one at a time

    Single-piece flow minimizes work-in-process inventory, reduces lead time, and surfaces quality problems immediately since defects can't hide in large batches.

  3. Overall Equipment Effectiveness (OEE) is calculated from which three factors?

    Answer: Availability, Performance, and Quality

    OEE = Availability × Performance × Quality, providing a comprehensive measure of how effectively manufacturing equipment is being utilized.

  4. 'Standard work' in lean refers to:

    Answer: Documented, repeatable procedures that define the current best way to perform a task, used as the baseline for improvement

    Standard work captures the optimal sequence, timing, and method for each operation, creating a stable baseline that ensures consistency and provides a foundation for kaizen.

  5. In lean, a 'pull system' means:

    Answer: Downstream processes signal upstream processes to produce only what is needed, when it is needed

    A pull system produces items only in response to actual demand signals from downstream processes or customers, preventing overproduction and excess inventory.

  6. 'SMED' (Single-Minute Exchange of Die) is a technique for:

    Answer: Drastically reducing equipment changeover and setup time to under 10 minutes

    SMED, developed by Shigeo Shingo, focuses on converting internal setup activities to external ones and streamlining all setup steps to achieve changeover times under 10 minutes.

How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. asq.org — Eligibility, fees, exam format, registration deadline, retake fee, test dates, score release, test delivery, score validity, passing score · verified Oct 2026