Management Accounting (MA) Standard Costing and Variance Analysis Flashcards
14 cards from real ACCA AK practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 14 Management Accounting (MA) Standard Costing and Variance Analysis flashcards as text
What is a standard cost?
Answer: A predetermined cost for a unit of output based on expected conditions
A standard cost is a predetermined cost calculated in advance of production, based on expected levels of efficiency and prices.
Which type of standard assumes perfect operating conditions with no wastage or inefficiency?
Answer: Ideal standard
Ideal standards assume perfect conditions with no waste, idle time, or inefficiency, making them rarely achievable in practice.
The direct material price variance measures the difference between:
Answer: The standard price and actual price paid for the actual quantity purchased
Material price variance = (Standard price – Actual price) × Actual quantity purchased, isolating the effect of price differences on cost.
A company has a standard material usage of 5 kg per unit at £3/kg. Actual production was 100 units using 520 kg. What is the material usage variance?
Answer: £60 adverse
Standard quantity for actual output = 100 × 5 = 500 kg; variance = (500 – 520) × £3 = £60 adverse.
The direct labour rate variance is calculated as:
Answer: (Standard rate – Actual rate) × Actual hours worked
Labour rate variance = (Standard rate – Actual rate) × Actual hours worked, measuring the cost impact of paying more or less per hour than standard.
If workers complete actual output in fewer hours than the standard allows, the direct labour efficiency variance will be:
Answer: Favourable, as fewer hours were used than the standard allows
Labour efficiency variance = (Standard hours – Actual hours) × Standard rate; when actual hours are less than standard hours allowed, the variance is favourable.
An adverse variance indicates that:
Answer: Actual costs were higher or actual revenues were lower than standard
An adverse variance means actual costs exceeded standard costs or actual revenue fell below standard, both of which reduce profit.
In a standard costing operating statement, what is the typical starting point?
Answer: Budgeted profit (or contribution)
An operating statement starts with budgeted profit, then adds or deducts variances to reconcile to actual profit, bridging planned to actual performance.
Which department is typically held responsible for an adverse direct material price variance?
Answer: Purchasing department
The purchasing department negotiates and pays for raw materials, making it accountable for paying more or less than the standard price.
Which of the following is most likely to cause a favourable direct labour efficiency variance?
Answer: Workers using a higher-grade material that is easier and faster to process
Higher-grade material that is easier to work with reduces processing time, allowing workers to complete output faster than the standard time allows.
What does an idle time variance represent?
Answer: The cost of hours paid to workers during which no production occurred
Idle time variance = Idle hours × Standard labour rate, representing wages paid during periods when workers are available but not productively employed.
The purpose of splitting variances into planning and operational components is to:
Answer: Separate variances caused by poor original planning from those caused by operational performance
Planning variances reflect changes between the original and revised standard due to environmental changes, while operational variances measure actual performance against the revised standard.
If actual profit exceeds budgeted profit, what must be true of the net total of all variances for the period?
Answer: The net total of all variances must be favourable
All variances together bridge budgeted profit to actual profit; if actual profit exceeds the budget, the net effect of all variances must be favourable.
A company uses attainable standards. This means the standards:
Answer: Can be achieved by an efficient and motivated workforce under normal working conditions
Attainable standards allow for normal levels of waste and downtime but exclude inefficiency; they are challenging but achievable and are the most commonly used type in practice.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- accaglobal.com — Passing score, time limit, score release, test dates, score validity, eligibility, test delivery, exam information · verified Nov 2026
- britishcouncil.org — Retake policy · verified Oct 2026