STEAMFITTER Cheat Sheet 2026

The 30 highest-yield STEAMFITTER facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

130 questions
240 min time limit
70.00% to pass
  1. What is the primary purpose of the Steamfitter-Pipefitter exam? → To certify the competency of steamfitters and pipefitters for professional practice.
  2. What is the primary purpose of a Tier II report submitted under EPCRA Section 312? → To inventory hazardous chemicals stored on-site above threshold quantities
  3. When selecting a pipe hanger for a high-temperature steam line, which type compensates for axial thermal expansion? → Pipe roller support
  4. A steamfitter notices a safety relief valve is 'simmering' (leaking slightly) below its set pressure. What is the correct action? → Tag the valve out of service and replace it
  5. What is the purpose of a work breakdown structure (WBS)? → To decompose the project into smaller, manageable work packages
  6. When applying for a job as a journeyman pipefitter on a prevailing wage project, which document is an employer legally required to pay based on? → The Davis-Bacon Act prevailing wage determination for that project
  7. What type of questions can you expect on the Steamfitter-Pipefitter exam? → Multiple-choice questions and practical demonstrations.
  8. During a visual weld inspection, what condition in a fillet weld would require immediate rejection? → Undercut exceeding 1/32 inch
  9. Which ASME piping code applies to process piping in chemical, petroleum refining, and pharmaceutical facilities? → ASME B31.3
  10. Which of the following best describes the purpose of a piping system cleanliness flush before commissioning? → To remove mill scale, weld slag, and debris that could damage valves and equipment
  11. When installing new piping in a facility subject to the Risk Management Program (RMP), which threshold quantity of ammonia requires a Program 3 RMP? → 10,000 pounds
  12. What role does data collection play in quality improvement? → It provides objective evidence for identifying trends and measuring progress
  13. On the steamfitter journeyman exam, questions about pipe schedule refer to which physical property of the pipe? → The wall thickness of the pipe
  14. What is preventive maintenance? → Scheduled maintenance performed to prevent breakdowns before they occur
  15. What is the primary purpose of a stress-isometric drawing in steamfitting? → To illustrate pipe stress analysis results including support locations and expansion loops
  16. Why is it important to document ambient temperature during field hydrostatic testing of carbon steel pipe? → To ensure water temperature does not cause brittle fracture in the pipe
  17. Which industry is most likely to employ certified Steamfitters and Pipefitters? → Manufacturing, energy, and construction.
  18. Which ASME code section governs the documentation requirements for boiler and pressure vessel inspection records? → ASME Section VIII Div. 1
  19. When assessing the risk of water hammer in a steam distribution system, which condition is the GREATEST contributing factor? → Condensate accumulation in horizontal pipe sections
  20. How long is the typical duration of the Steamfitter-Pipefitter exam? → 3-4 hours.
  21. Which instrument is used to verify that a steam trap is functioning and not passing live steam (blowing through)? → Ultrasonic leak detector or infrared thermometer
  22. A steamfitter must grind pipe flanges using an angle grinder. Which combination of PPE best mitigates the specific risks of this task? → Face shield over safety glasses, hearing protection, and cut-resistant gloves
  23. A steamfitting crew is behind schedule due to late material delivery. The project manager uses overtime to recover the lost time. This technique is called: → Crashing
  24. A concentric reducer is different from an eccentric reducer in that a concentric reducer: → Keeps the pipe centerlines aligned on the same axis
  25. A steamfitter must drain a chilled water system containing glycol-based antifreeze. What environmental regulation governs its proper disposal? → Resource Conservation and Recovery Act (RCRA)
  26. When studying pipe thread standards for the exam, which standard defines the taper for National Pipe Taper (NPT) threads? → ASME B1.20.1
  27. Under OSHA 29 CFR 1910.147, what is the minimum energy control procedure requirement before servicing pressurized piping systems? → Lockout/tagout all energy sources
  28. A pipe laser level is most useful during which phase of a steamfitting project? → Establishing grade and elevation for long pipe runs
  29. On a large steamfitting project, the project manager wants to track the percentage of work completed vs. planned. What tool is best suited for this? → S-curve (cumulative progress curve)
  30. Which organization most commonly administers the Steamfitter/Pipefitter certification exam in the United States? → NCCER