  1. What are the five steps of the HSE's recommended risk assessment process?

    Answer: Identify hazards, decide who might be harmed, evaluate risks and decide on precautions, record findings, and review and update

    The HSE's five-step approach to risk assessment is: (1) identify the hazards, (2) decide who might be harmed and how, (3) evaluate the risks and decide on precautions, (4) record your significant findings, and (5) review your risk assessment and update if necessary.

  2. What is the difference between a hazard and a risk in the context of construction site safety?

    Answer: A hazard is something with the potential to cause harm, while a risk is the likelihood that harm will occur combined with the severity of that harm

    A hazard is anything with the potential to cause harm (e.g., working at height, electricity, chemicals). A risk is the chance (likelihood) that somebody could be harmed by the hazard, combined with the severity of the harm. Risk assessment evaluates both elements.

  3. When must a risk assessment be reviewed on a construction site?

    Answer: When there is a significant change in the work, after an incident, when new information becomes available, or at regular planned intervals

    Risk assessments must be reviewed when there are significant changes to the work, plant, substances, or conditions; after an accident, incident, or near miss; when new information about risks becomes available; and at regular planned intervals to ensure they remain current and effective.

  4. What does the hierarchy of control measures specify as the most effective method of controlling risk?

    Answer: Eliminating the hazard entirely

    The hierarchy of control, from most to least effective, is: (1) Elimination — remove the hazard entirely, (2) Substitution — replace with a less hazardous option, (3) Engineering controls — isolate people from the hazard, (4) Administrative controls — change work procedures, (5) PPE — as a last resort.

  5. A generic risk assessment has been prepared for bricklaying. When is a site-specific risk assessment also required?

    Answer: When the site conditions differ from those assumed in the generic assessment, such as working at height, near live services, or in confined spaces

    A site-specific risk assessment is needed whenever actual site conditions differ from the assumptions in the generic assessment. This includes unusual locations, proximity to hazards like live services, work at height, confined spaces, ground conditions, or any factor that changes the risk profile.

  6. Who should be consulted when carrying out a risk assessment on a construction site?

    Answer: Workers who carry out the tasks, safety representatives, competent persons, and any specialists relevant to the hazards identified

    Effective risk assessment requires consultation with those who do the work (they understand the practical risks), safety representatives, competent health and safety advisers, and relevant specialists (e.g., structural engineers, occupational hygienists) depending on the hazards involved.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. citb.co.uk — Fees, renewal, test delivery, eligibility, exam format, passing score, retake fee, retake policy, time limit, score validity · verified Oct 2026