Risk Assessment & Method Statement Review Flashcards

6 cards from real SSSTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Risk Assessment & Method Statement Review flashcards as text
  1. What is the hierarchy of control measures, in order from most to least effective?

    Answer: Elimination, substitution, engineering controls, administrative controls, PPE

    The hierarchy of controls: Elimination (remove the hazard entirely), Substitution (replace with something less hazardous), Engineering controls (physical safeguards), Administrative controls (safe systems, training), and PPE (last resort personal protection). Most effective first.

  2. What does 'residual risk' mean after control measures have been applied?

    Answer: The remaining level of risk after all practicable control measures have been implemented

    Residual risk is the risk that remains after all reasonably practicable control measures have been put in place. Some residual risk is unavoidable. The risk assessment must demonstrate that residual risk has been reduced to as low as reasonably practicable.

  3. Which tool is commonly used to evaluate risk by combining likelihood and severity scores?

    Answer: A risk matrix (risk rating table)

    A risk matrix combines numerical scores for likelihood (probability of harm occurring) and severity (consequence if harm occurs) to produce an overall risk rating. This helps prioritise which risks require the most urgent attention.

  4. What does 'dynamic risk assessment' mean?

    Answer: A continuous mental assessment of changing conditions carried out by workers during a task to identify new hazards that were not anticipated in the formal risk assessment

    Dynamic risk assessment is the continuous, real-time process of recognising new or changed hazards during a task and responding appropriately. Workers and supervisors must constantly assess conditions as they change throughout the working day.

  5. What is the purpose of the 'record' step in the five-step risk assessment process?

    Answer: To document the significant findings so they can be communicated to workers and referred to if the assessment is challenged

    Recording the significant findings of a risk assessment is required for employers with five or more employees. The record communicates the hazards and controls to workers and provides evidence that a proper assessment was carried out if challenged.

  6. When is a 'dynamic risk assessment' particularly important on a construction site?

    Answer: When working conditions change unexpectedly — e.g., when unexpected ground conditions, weather changes or adjacent activities create new hazards

    Dynamic risk assessment is particularly important when site conditions change unexpectedly, such as deteriorating weather, discovery of unexpected underground services, changes in adjacent activities or any situation not covered by the formal risk assessment.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. citb.co.uk — Fees, renewal, test delivery, eligibility, exam format, passing score, retake fee, retake policy, time limit, score validity · verified Oct 2026