Risk Assessment & Method Statement Review Flashcards

6 cards from real SSSTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Risk Assessment & Method Statement Review flashcards as text
  1. What is a Method Statement and how does it relate to a risk assessment?

    Answer: A Method Statement sets out the sequence of work and the safe system of work; together with the risk assessment it forms a RAMS document

    A Method Statement describes how a specific task will be carried out safely, step by step, including the sequence of operations and the control measures. Combined with the risk assessment, it forms a RAMS (Risk Assessment and Method Statement) document that guides safe working.

  2. When should a risk assessment be reviewed?

    Answer: When there is reason to believe it is no longer valid (e.g., changes in conditions, after an accident) and at suitable intervals

    Risk assessments must be kept up to date. Reviews are required when there is reason to believe the assessment is no longer valid — for example, when working methods change, new hazards arise, after an accident, or when there are significant changes in the workforce.

  3. What is a 'generic' risk assessment and when is it acceptable?

    Answer: A risk assessment for typical activities that can be adapted for site-specific conditions; acceptable as a starting point but must be reviewed and amended for actual site conditions

    Generic risk assessments cover typical hazards for common activities and are provided by trade associations or employers as a starting point. They must always be adapted to reflect the actual hazards and conditions on the specific site before use.

  4. What is the role of workers in the risk assessment process?

    Answer: Workers should be consulted as they have practical knowledge of hazards not obvious to managers or safety professionals

    Workers have valuable insight into the practical hazards of their tasks. The Management of Health and Safety at Work Regulations 1999 require employers to consult employees on health and safety matters including risk assessments. Worker input improves assessment quality.

  5. What does RAMS stand for?

    Answer: Risk Assessment and Method Statement

    RAMS stands for Risk Assessment and Method Statement. This combined document identifies the hazards of a specific task, evaluates the risks and specifies the safe system of work to be followed, including the sequence of operations and control measures.

  6. What should a site supervisor do if a subcontractor's method statement does not adequately address a site-specific hazard?

    Answer: Reject the method statement and require it to be revised before work commences

    A method statement that fails to address a site-specific hazard provides an inadequate safe system of work. The supervisor must reject it and require the subcontractor to revise it to properly address all significant hazards before any work starts.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. citb.co.uk — Fees, renewal, test delivery, eligibility, exam format, passing score, retake fee, retake policy, time limit, score validity · verified Oct 2026