Method Statements Flashcards

6 cards from real SSSTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Method Statements flashcards as text
  1. What is the purpose of a method statement on a construction site?

    Answer: To describe the safe system of work for a specific activity, detailing the sequence of operations, hazards, and control measures step by step

    A method statement (also called a safe system of work) describes how a specific task or activity will be carried out safely. It details the sequence of operations, identifies hazards at each stage, specifies control measures, and outlines the resources, equipment, and competencies required.

  2. Who should be involved in preparing a method statement for a high-risk activity such as steel erection?

    Answer: The site supervisor, workers who will carry out the task, the structural engineer, and the health and safety adviser

    Method statements for high-risk activities should be prepared collaboratively, involving those with practical site knowledge (supervisors and workers), technical expertise (engineers), and safety competence (H&S advisers). This ensures the method is both technically correct and practically workable.

  3. What key information should a method statement include?

    Answer: The scope of work, sequence of operations, hazards and risks, control measures, PPE requirements, emergency procedures, and the competencies needed

    A comprehensive method statement includes: description and scope of the work, step-by-step sequence of operations, hazards and risks at each stage, control measures for each hazard, PPE requirements, plant and equipment needed, competency requirements, emergency procedures, and environmental considerations.

  4. How should a method statement be communicated to the workers who will carry out the task?

    Answer: Brief the workers directly, explain each step and the associated controls, answer questions, confirm understanding, and keep the document accessible on site

    The method statement must be actively communicated through face-to-face briefings where workers can ask questions. The supervisor should explain each step, highlight the key risks and controls, confirm workers understand their responsibilities, and ensure the document remains accessible for reference throughout the task.

  5. When should a method statement be revised?

    Answer: When site conditions change, the work method is altered, new hazards are identified, after an incident, or when a review identifies improvements

    Method statements should be revised when there are changes to site conditions, work methods, equipment, or personnel; when new hazards are identified; after an accident or near miss relating to the activity; or when a review identifies that improvements can be made to the safe system of work.

  6. What is the relationship between a risk assessment and a method statement?

    Answer: The risk assessment identifies the hazards and evaluates the risks, while the method statement describes how the work will be done safely, incorporating the control measures identified in the risk assessment

    The risk assessment and method statement are complementary documents. The risk assessment identifies what can go wrong and evaluates the level of risk. The method statement then describes the safe system of work, incorporating the control measures identified in the risk assessment into a practical, step-by-step procedure.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. citb.co.uk — Fees, renewal, test delivery, eligibility, exam format, passing score, retake fee, retake policy, time limit, score validity · verified Oct 2026