Method Statements Flashcards
6 cards from real SSSTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Method Statements flashcards as text
What is a permit-to-work system, and how does it relate to method statements?
Answer: A permit-to-work is a formal documented system for controlling high-risk activities, used alongside the method statement to ensure additional checks and authorisations are in place before work begins
A permit-to-work is a formal documented control system for high-risk activities (hot work, confined space entry, electrical isolation). It works alongside the method statement by adding a layer of authorisation, pre-work checks, and sign-off to ensure conditions are safe before work starts.
A method statement specifies that a particular task requires a banksman. What is the role of a banksman?
Answer: A trained person who guides vehicle and plant movements using agreed hand signals or radio communication to ensure safe operations
A banksman (also called a signaller) is a trained person who directs the movement of vehicles, cranes, or plant on site using standardised hand signals or radio communication. They ensure safe movement in areas where the operator's visibility is restricted or where pedestrians may be at risk.
How should a method statement address environmental controls on a construction site?
Answer: Include measures to control dust, noise, vibration, waste disposal, protection of watercourses, and any ecological protections required
Method statements should address environmental impacts including dust suppression measures, noise and vibration controls (especially near residential areas), waste management and disposal procedures, protection of watercourses from pollution, ecological protections (protected species, trees), and compliance with environmental permits.
What should a method statement specify regarding the inspection and maintenance of equipment used for the task?
Answer: The pre-use inspection requirements, maintenance schedule, competent persons who can inspect, and actions to take if equipment is found to be defective
The method statement should specify what pre-use checks are required (daily inspections), the formal inspection schedule (e.g., weekly for scaffolding under the Work at Height Regulations), who is competent to carry out inspections, required documentation, and the procedure for taking defective equipment out of service.
In a method statement for excavation work, what specific hazards must be addressed?
Answer: Collapse of excavation sides, striking underground services, proximity to structures, water ingress, access and egress, falling objects, and fumes in deep excavations
Excavation method statements must address multiple hazards: collapse of sides (requiring support or battering back), striking underground services (requiring service plans and CAT/Genny scans), proximity to adjacent structures, water ingress, safe access and egress, falling objects, and hazardous atmospheres in deep excavations.
What is a RAMS pack and why is it important on a construction site?
Answer: A combined Risk Assessment and Method Statement package that documents hazards, controls, and safe working procedures for specific activities, required before work can commence
A RAMS (Risk Assessment and Method Statement) pack combines both documents for a specific activity. It must be reviewed and accepted by the principal contractor before work starts. It demonstrates that the contractor has identified hazards, assessed risks, and developed a safe system of work.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- citb.co.uk — Fees, renewal, test delivery, eligibility, exam format, passing score, retake fee, retake policy, time limit, score validity · verified Oct 2026