CDM 2015 Flashcards
6 cards from real SSSTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 CDM 2015 flashcards as text
Under the Construction (Design and Management) Regulations 2015, who has overall responsibility for the management of health and safety during the construction phase?
Answer: The principal contractor
Under CDM 2015, the principal contractor has overall responsibility for planning, managing, monitoring, and coordinating health and safety during the construction phase. They must ensure that the construction phase plan is prepared and implemented, and that all contractors comply with their duties.
What is the client's duty under CDM 2015 before construction work begins?
Answer: The client must make suitable arrangements for managing the project, ensure adequate time and resources are allocated, and appoint a principal designer and principal contractor where required
CDM 2015 places significant duties on clients including: making suitable arrangements for managing the project, ensuring adequate time and resources, appointing a principal designer and principal contractor (for projects with more than one contractor), providing pre-construction information, and ensuring a construction phase plan is in place.
What is the purpose of a construction phase plan under CDM 2015?
Answer: To set out the health and safety arrangements, site rules, and specific measures for managing high-risk activities during the construction phase
The construction phase plan (required under Regulation 12) sets out the arrangements for managing health and safety during construction. It includes site rules, arrangements for controlling significant risks, emergency procedures, and management of specific high-risk activities such as work at height or with asbestos.
Under CDM 2015, what must a designer do to comply with their duties?
Answer: Designers must eliminate foreseeable risks where possible, reduce risks that cannot be eliminated, and provide information about any remaining risks to those who need it
Under CDM 2015 Regulation 9, designers must eliminate foreseeable risks so far as reasonably practicable through design choices, reduce risks that cannot be eliminated through design, and provide information about remaining significant risks to contractors and others who need it for safe construction and maintenance.
What triggers the requirement to notify the HSE about a construction project under CDM 2015?
Answer: Projects lasting longer than 30 working days with more than 20 workers at any one time, or exceeding 500 person-days of construction work
Under CDM 2015 Regulation 6, notification to the HSE is required when the construction work is expected to last longer than 30 working days and have more than 20 workers on site at any one time, or exceed 500 person-days of construction work. The notification (F10) must be displayed on site.
What is the role of the principal designer under CDM 2015?
Answer: To plan, manage, monitor, and coordinate health and safety during the pre-construction phase, and to ensure designers comply with their duties
The principal designer, appointed under CDM 2015 Regulation 5, plans, manages, monitors, and coordinates health and safety during the pre-construction phase. They facilitate collaboration between designers, ensure designers comply with CDM duties, and prepare the health and safety file.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- citb.co.uk — Fees, renewal, test delivery, eligibility, exam format, passing score, retake fee, retake policy, time limit, score validity · verified Oct 2026