  1. What is the primary purpose of a Business Continuity Plan (BCP)?

    Answer: To ensure critical business functions continue during and after a disaster

    A BCP is designed to ensure that critical business operations can continue or be quickly restored during and after a disruption, minimizing downtime and financial loss.

  2. What does Recovery Time Objective (RTO) define?

    Answer: The maximum acceptable time to restore a system or process after a failure

    RTO defines the maximum acceptable duration for restoring operations after a disruption, setting the target time within which systems must be recovered.

  3. What does Recovery Point Objective (RPO) define?

    Answer: The maximum acceptable amount of data loss expressed as a point in time

    RPO defines the maximum acceptable amount of data loss measured in time, indicating the point to which data must be restored after a disaster.

  4. What is a Business Impact Analysis (BIA)?

    Answer: A process that identifies critical business functions and the impact of their disruption

    A BIA identifies critical business functions, their dependencies, and the potential financial and operational impact of disruptions, forming the foundation of effective BCP.

  5. What is a 'hot site' in the context of disaster recovery?

    Answer: A fully equipped backup facility that can assume operations immediately after a disaster

    A hot site is a fully equipped, operational duplicate facility with current data replication that can assume business operations immediately after a disaster is declared.

  6. What is Maximum Tolerable Downtime (MTD)?

    Answer: The longest period a critical business function can be unavailable before causing irreparable damage

    MTD (also called Maximum Tolerable Period of Disruption) is the absolute maximum time a critical business function can remain offline before the organization suffers unacceptable or irreversible harm.

  7. What is the correct sequence for developing a Business Continuity Plan?

    Answer: Business Impact Analysis, risk assessment, strategy development, plan implementation

    BCP development follows: BIA (identify critical functions) → risk assessment (identify threats) → strategy development (define recovery options) → plan implementation and testing.

  8. What distinguishes a 'cold site' from a 'hot site' in disaster recovery?

    Answer: A cold site is minimally equipped requiring significant setup, while a hot site is fully operational immediately

    A cold site provides basic infrastructure (space, power, connectivity) but requires equipment installation and configuration before use, while a hot site is immediately operational.

  9. Which backup type copies only the data that changed since the last backup of ANY type?

    Answer: Incremental backup

    An incremental backup copies only data changed since the last backup (full or incremental), making each backup small and fast but requiring multiple sets for a complete restore.

  10. Which backup type copies all data changed since the last FULL backup regardless of intermediate backups?

    Answer: Differential backup

    A differential backup copies all data changed since the last full backup, meaning each differential grows larger over time but restore requires only two sets: the last full and the last differential.

  11. What is a tabletop exercise in BCP testing?

    Answer: A discussion-based walkthrough where participants talk through disaster scenarios and their responses

    A tabletop exercise is a low-cost, discussion-based session where key personnel walk through a disaster scenario verbally to identify gaps in the plan without disrupting operations.

  12. What does Mean Time To Recover (MTTR) measure?

    Answer: The average time required to restore a failed system to normal operation

    MTTR is the average (mean) time required to repair or restore a system after failure, and is a key metric for evaluating recovery capability and SLA compliance.

  13. What is a 'parallel test' in disaster recovery?

    Answer: Activating the recovery site and running operations there while production systems remain online

    A parallel test activates the recovery site and verifies it can handle operations while keeping primary production systems fully operational, providing realistic testing without service disruption.

  14. What is the primary purpose of a call tree (notification tree) in BCP?

    Answer: To provide a structured chain for rapidly notifying all relevant personnel during a disaster

    A call tree defines a branching notification sequence so that each person contacts a defined set of others, ensuring all key personnel are reached quickly without a single point of contact becoming overwhelmed.

  15. Which type of BCP test is most disruptive but provides the most realistic validation of recovery capabilities?

    Answer: Full interruption test

    A full interruption test completely shifts live operations to the recovery site, providing the most realistic test of BCP effectiveness but carrying the highest operational risk.

  16. What does 'failover' mean in the context of disaster recovery?

    Answer: Automatically or manually switching operations to a redundant backup system when the primary fails

    Failover is the process of switching to a redundant standby system automatically or manually when the primary system becomes unavailable, maintaining service continuity.

  17. What is a 'warm site' in disaster recovery?

    Answer: A partially equipped facility requiring some setup time before becoming operational

    A warm site has partial equipment and infrastructure in place, requiring some configuration and data restoration before becoming operational, offering a balance between cost and recovery speed.

  18. Which backup strategy typically results in the slowest individual restore time?

    Answer: Incremental backup restoration

    Incremental backup restoration is slowest because you must restore the last full backup plus every incremental backup taken since, requiring the most media and time to achieve a complete restore.

  19. What is 'resilience' in the context of business continuity planning?

    Answer: The organizational capacity to absorb disruptions and rapidly return to normal operations

    Resilience refers to an organization's ability to withstand disruptions, adapt to adverse conditions, and quickly recover to normal or near-normal operations after an incident.

  20. What is the relationship between RTO and MTD in business continuity planning?

    Answer: RTO must always be less than or equal to MTD to ensure recovery before irreparable damage occurs

    RTO must be set at or below MTD so that systems are restored within the maximum tolerable downtime window — if RTO exceeds MTD, the organization will suffer irreparable harm before recovery completes.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. isc2.org — Passing score, eligibility, score validity, registration deadline, renewal, exam format, score release, time limit, fees, exam information · verified Nov 2026
  2. pearsonvue.com — Test delivery · verified Nov 2026