← All SQA Flashcard Decks

Startup Flashcards

7 cards from real SQA practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Startup flashcards as text
  1. During a GLP study startup, which document must be finalized before any study-specific procedures begin?

    Answer: The signed study protocol

    GLP regulations require the signed study protocol to be in place before study-specific procedures commence.

  2. What is the purpose of a 'pre-study audit' conducted by a QA unit during startup?

    Answer: To review protocol and facility readiness before work begins

    A pre-study audit ensures the protocol is sound and the facility, equipment, and personnel are prepared before study initiation.

  3. When a test facility receives a study sponsor's protocol amendment during startup, what is the FIRST action required under GLP?

    Answer: Review, approve, and sign the amendment before proceeding

    Protocol amendments must be reviewed, approved, and signed by the Study Director before any amended procedures are implemented.

  4. Which of the following best describes 'study initiation date' under GLP guidelines?

    Answer: The date the Study Director signs the protocol

    The study initiation date is defined as the date the Study Director signs the study protocol.

  5. During startup, a laboratory discovers that a required piece of equipment is out of calibration. What must occur before the study proceeds?

    Answer: Calibrate, verify accuracy, and document before use

    GLP requires that all equipment be calibrated and verified as fit for purpose before it is used in a study.

  6. Who is responsible for ensuring that all study personnel are adequately trained before study startup under GLP?

    Answer: The Study Director

    The Study Director is responsible for ensuring all personnel involved in the study have appropriate training, experience, and qualifications.

  7. Which startup activity ensures that the test system (e.g., animals, cells) meets the protocol specifications before study procedures begin?

    Answer: Test system acclimation and characterization

    Acclimation and characterization confirm the test system's health, identity, and suitability prior to experimental procedures.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. sqa.org — Score validity, registration, test delivery, eligibility, fees, exam format, late registration, passing score, retake fee, retake policy · verified Nov 2026