(SPE) Society of Petroleum Engineers Certification Practice Test
✕
📝 SPE Practice Tests
Artificial Lift Systems
Drilling Engineering Principles
Drilling & Well Completion
Formation Evaluation and Logging
Health, Safety, and Environment
Health, Safety & Environmental Regulations
Production and Operations
Production Operations & Optimization
Project Economics
Reservoir Characterization
Reservoir Engineering & Management
Well Completions and Stimulation
Well Testing and Pressure Transient Analysis
📖 SPE Study Guides
SPE Exam #1
🎥 SPE Videos
SPE Flashcards
Study Guide
SPE Study Guide
Cheat Sheet
SPE Cheat Sheet
Articles
Society of Petroleum Engineers Certification: Your Complete Guide to Success
SPE Practice Test PDF (Free Printable 2026)
☰
(SPE) Society of Petroleum Engineers Certification Practice Test
▶
SPE Project Economics 2
Free · Instant Results
A project has an NPV of $0 at a discount rate of 18%. What does this indicate?
A
The project generates no cash flows
B
18% is the project's internal rate of return
C
The project should be rejected
D
The discount rate is too high for evaluation