Construction Management Flashcards
6 cards from real SCE practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Construction Management flashcards as text
What is the purpose of a site safety plan in Saudi Arabian construction?
Answer: To identify hazards and establish procedures for preventing accidents and ensuring worker safety
A site safety plan identifies project-specific hazards, establishes safety procedures, PPE requirements, emergency response plans, and worker training requirements. Saudi Arabia requires compliance with OSHA-equivalent standards.
In construction, a punch list (snag list) is:
Answer: A list of incomplete or defective items to be corrected before final acceptance
The punch list is compiled during pre-completion inspections, documenting items that need correction, completion, or repair before the owner accepts the work and releases final payment.
What is the difference between preliminary and detailed cost estimates in construction?
Answer: Preliminary estimates are approximate early assessments; detailed estimates are based on complete designs and quantities
Preliminary estimates (±20-30% accuracy) are made during conceptual/schematic design for budgeting. Detailed estimates (±5-10% accuracy) are based on complete drawings and specifications for bidding and contracts.
Lean construction principles aim to:
Answer: Minimize waste, maximize value, and improve workflow through continuous improvement
Lean construction adapts Toyota's lean manufacturing principles to construction, focusing on eliminating waste (waiting, overproduction, defects), optimizing workflow, and delivering value to the client.
In Saudi construction, retention money is typically:
Answer: 5-10% of each progress payment withheld as security for defects liability period
Retention (typically 5-10%) is deducted from each progress payment and held by the owner. Half is released at substantial completion, the remainder at the end of the defects liability period (typically 12 months).
Building Information Modeling (BIM) in Saudi construction is used for:
Answer: Creating a digital representation of the building for design coordination, clash detection, and construction planning
BIM creates an intelligent 3D model integrating geometry, spatial relationships, and building component data. It enables clash detection, quantity takeoff, 4D scheduling, and facility management in Saudi mega-projects.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- proscheduler.prometric.com — Eligibility, retake policy · verified Nov 2026
- prometric.com — Test delivery · verified Nov 2026