Construction Management Flashcards
6 cards from real SCE practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Construction Management flashcards as text
What is the purpose of a pre-qualification process for contractors in Saudi Arabia?
Answer: To evaluate a contractor's capability, experience, and financial capacity before bidding
Pre-qualification assesses contractors' technical capability, relevant experience, financial stability, equipment, personnel, and safety record to ensure only qualified firms bid on projects.
In construction cost estimation, direct costs include:
Answer: Labor, materials, equipment, and subcontractor costs directly attributable to specific work
Direct costs are expenses directly traceable to specific project activities: worker wages, material quantities, equipment rental, and subcontractor payments. They form the basis of the project cost estimate.
What is 'just-in-time' delivery in construction?
Answer: Materials arrive at the site exactly when needed, minimizing storage requirements
JIT delivery coordinates material arrival with the construction schedule, reducing on-site storage needs, material damage, theft risk, and cash flow requirements. This is especially valuable in Saudi's dusty conditions.
Construction document control involves:
Answer: Managing the creation, distribution, revision, and archiving of all project documents
Document control ensures all parties have current, approved versions of drawings, specifications, RFIs, submittals, and correspondence. It prevents use of superseded documents and maintains the project record.
What is the purpose of a commissioning plan in construction?
Answer: To systematically verify that all building systems are installed and functioning as designed
A commissioning plan outlines the procedures for testing and verifying all building systems (HVAC, electrical, fire, plumbing, controls) to ensure they operate as specified before handover to the owner.
In Saudi construction, a mobilization payment is:
Answer: An advance payment to help the contractor set up site facilities and bring resources to the project
Mobilization advance (typically 10-20% of contract value) helps contractors establish site offices, bring equipment, and purchase initial materials. It is recovered through deductions from subsequent progress payments.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- proscheduler.prometric.com — Eligibility, retake policy · verified Nov 2026
- prometric.com — Test delivery · verified Nov 2026