← All SACA Flashcard Decks

Smart Factory Data Analytics Flashcards

6 cards from real SACA practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Smart Factory Data Analytics flashcards as text
  1. What is 'OEE' (Overall Equipment Effectiveness) and how is it calculated?

    Answer: OEE = Availability × Performance × Quality, expressing the percentage of scheduled production time that is truly productive — a perfect score of 100% means running at maximum speed, producing only good parts, with no downtime

    OEE = Availability × Performance × Quality. Availability = (Operating Time / Planned Production Time). Performance = (Actual Output / (Operating Time × Ideal Rate)). Quality = (Good Parts / Total Parts). A world-class OEE for discrete manufacturing is 85%; typical industry average is 60%.

  2. What is 'predictive maintenance' and how does it differ from preventive maintenance?

    Answer: Predictive maintenance uses real-time condition monitoring data (vibration, temperature, oil analysis) to predict when a specific component will fail — scheduling maintenance just before failure. Preventive maintenance replaces components on fixed time/cycle intervals regardless of actual condition

    Predictive maintenance (PdM) monitors actual equipment condition to predict remaining useful life — performing maintenance only when indicated, reducing unnecessary replacements. Preventive maintenance (PM) uses fixed intervals based on average failure rates — replacing healthy components and missing failures occurring between PM intervals.

  3. What is a 'digital manufacturing execution system' (MES) and what data does it connect between ERP and factory floor systems?

    Answer: A system bridging ERP business systems (orders, materials, quality specs) with factory control systems (PLCs, robots, test equipment) — managing work orders, tracking WIP, collecting production actuals, and enforcing quality procedures in real-time

    MES (ISA-95 Level 3) sits between ERP (Level 4, business planning) and automation (Level 1-2, control). It receives production orders from ERP, dispatches work to machines, tracks WIP and traceability, collects actual production data (cycle times, quality results, downtime), and reports actuals back to ERP for cost accounting.

  4. What is 'Statistical Process Control' (SPC) and what does a 'control chart' reveal?

    Answer: A methodology using statistical limits (control limits) on time-series charts of process measurements to distinguish between normal random variation (common cause) and significant process shifts (special cause) requiring investigation

    SPC control charts (Shewhart charts: X-bar/R, CUSUM, EWMA) plot process measurements over time with statistically derived Upper and Lower Control Limits (UCL/LCL = mean ± 3σ). Points outside these limits or non-random patterns signal that the process has changed — distinguishing meaningful signals from random noise.

  5. What is 'machine learning anomaly detection' in industrial equipment monitoring and how is it trained?

    Answer: An ML model trained on normal operating data that learns the expected sensor signature patterns — flagging deviations that exceed learned normal variation as anomalies potentially indicating developing faults

    Anomaly detection models (autoencoders, isolation forests, LSTM-based) are trained exclusively on 'normal' equipment operation data. The model learns the expected relationships between hundreds of sensor variables; during operation, any pattern that deviates significantly from learned normality is flagged as an anomaly — potentially indicating a developing fault.

  6. What is 'value stream mapping' (VSM) in the context of smart factory data analytics?

    Answer: A lean manufacturing visualization technique that maps material and information flows from raw material to customer delivery — used to identify waste, bottlenecks, and improvement opportunities in the production process

    Value stream mapping (Toyota Production System) creates a visual map of all process steps, wait times, inventory buffers, information flows, and cycle times from raw material to finished goods delivery — enabling identification of non-value-added steps (muda/waste) for elimination or reduction.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. saca.org — Retake policy, score release, test delivery, eligibility · verified Nov 2026