OSHA 29 CFR 1926.1417 requires crane operators to perform a pre-shift inspection. Which of the following is included in this inspection?
-
A
Checking rigging certificates for validity
-
B
Inspecting control mechanisms for maladjustment
-
C
Verifying rigger qualifications
-
D
Reviewing the lift plan with the signal person