RSP Cheat Sheet 2026

The 30 highest-yield RSP facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

100 questions
90 min time limit
70.00% to pass
  1. A rigger is preparing to lift a load in an area where the temperature is 400°F (204°C). Which sling type is BEST suited for this application? Alloy steel chain sling
  2. How should emergency situations be handled during load handling? Stop and notify
  3. The minimum distance a rigger should stand from a load being lifted is: Far enough to avoid being struck if the load swings, falls, or the rigging fails
  4. When rigging a cylindrical load such as a pipe using a choker hitch, where should the choke point be located? Above the horizontal centerline, on the upper third of the cylinder
  5. Which assessment method provides the MOST reliable data for RSP professionals making critical decisions? Standardized tools combined with professional observation
  6. What is the correct practice when placing rigging on a hook with multiple sling legs? Ensure slings are evenly distributed and do not cross each other on the hook
  7. How often should employers conduct safety training? Regularly
  8. Which foundational principle is MOST important for success in Rigger and Signal Person Certification? Commitment to continuous learning, ethical practice, and quality outcomes
  9. What is the minimum number of wire rope clips required to secure a loop in a 1-inch diameter wire rope? 4 clips
  10. What is the primary goal of load handling safety? Prevent injury and damage
  11. What is the proper way to signal a crane operator when load is ready? Use hand signals or radios
  12. Which condition would require an immediate work stoppage during an outdoor crane lift? Wind speed exceeding the crane manufacturer's limits for the configuration
  13. What is the purpose of a spreader bar (spreader beam) in a rigging assembly? To reduce sling tension by eliminating horizontal compression on the load
  14. What action should be taken if damaged rigging is found? Remove and report
  15. What is the primary purpose of using a tag line (guide rope) during a lift? To control the load's rotation and prevent uncontrolled swinging
  16. The 'design factor' (also called safety factor) for alloy steel chain slings per ASME B30.9 is: 4:1
  17. According to OSHA 29 CFR 1926.1408, what is the minimum clearance distance from energized overhead power lines up to 50 kV when operating a crane? 10 feet
  18. What is the purpose of a load moment indicator (LMI) on a crane? To alert the operator when the crane approaches its rated load moment
  19. Which factor does NOT affect the rated capacity of a wire rope sling? The color of the plastic sleeve on the sling
  20. What does a 'headache ball' serve as in a crane rigging setup? A weight that keeps the hook block and wire rope taut when unloaded
  21. What is OSHA’s focus for construction sites? Prevent common hazards
  22. What is the safest way to lift a load? Use approved equipment and procedures
  23. What is the primary purpose of outriggers on a mobile crane? To stabilize the crane and increase its lifting capacity
  24. What does it mean when a signal person uses the 'emergency stop' signal? Stop all crane movement immediately due to a safety emergency
  25. Which assessment method provides the MOST reliable data for RSP professionals making critical decisions? Standardized tools combined with professional observation
  26. Which statement BEST describes the relationship between Rigger and Signal Person Certification certification and industry evolution? Requirements evolve periodically to reflect advances in knowledge and practice
  27. What is the PRIMARY purpose of obtaining RSP certification in Rigger and Signal Person Certification? To demonstrate verified competency and adherence to professional standards
  28. Which of the following conditions would require a crane operator to reduce the crane's working radius to stay within rated capacity? The ground is soft or the outriggers are not fully extended
  29. Before a lift begins, a signal person should verify which of the following? That communication methods are established and understood by the operator
  30. A new crane operator is assigned to a job where signals will be used. Who is responsible for ensuring the operator and signal person use the same signal system? Both the operator and signal person, confirmed before operations begin
Turn these facts into recall:
Was this helpful?