A rigger is lifting a steel beam and notices it will pass over workers below. What action is required?
-
A
Sound the crane horn twice before hoisting to warn workers
-
B
Clear all personnel from the area beneath and swing path of the load
-
C
Post a warning sign at the perimeter and continue the lift
-
D
Reduce lift speed to minimum to give workers time to move