When a load begins to swing during a lift, what is the FIRST corrective action a signal person should take?
-
A
Signal the operator to hoist higher to clear the swing
-
B
Signal the operator to stop all movement immediately
-
C
Instruct ground workers to grab the load and stabilize it
-
D
Continue signaling normal operations until swing stops naturally