← All RRT Flashcard Decks

Environmental Regulations & Compliance Flashcards

7 cards from real RRT practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Environmental Regulations & Compliance flashcards as text
  1. Black cutback adhesive found under old flooring should be treated how before removal?

    Answer: As presumed asbestos-containing until tested

    Older black asphalt-based cutback mastics often contain asbestos and should be presumed ACM until lab testing proves otherwise.

  2. Under the asbestos NESHAP, a material is regulated as asbestos-containing when it contains more than what percentage of asbestos?

    Answer: 1%

    NESHAP defines asbestos-containing material as anything with more than 1% asbestos.

  3. What is the OSHA permissible exposure limit for asbestos as an 8-hour time-weighted average?

    Answer: 0.1 f/cc

    OSHA sets the asbestos PEL at 0.1 fibers per cubic centimeter over 8 hours.

  4. Resilient floor coverings such as vinyl asbestos tile are classified under NESHAP as which material type?

    Answer: Category I nonfriable ACM

    NESHAP lists resilient floor coverings, packings, gaskets, and asphalt roofing as Category I nonfriable ACM.

  5. Which removal method is recommended for asbestos-containing resilient flooring to minimize fiber release?

    Answer: Wet methods with manual removal, avoiding sanding or grinding

    Wetting and removing intact pieces without sanding, grinding, or pulverizing keeps nonfriable ACM from becoming friable.

  6. For larger renovations, NESHAP requires written notification to the regulating agency how far in advance when regulated asbestos thresholds are exceeded?

    Answer: 10 working days

    NESHAP requires notice at least 10 working days before renovation or demolition exceeding threshold quantities.

  7. What is the NESHAP threshold for regulated asbestos on facility components other than pipes, such as floors?

    Answer: 160 square feet

    NESHAP thresholds are 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. iicrc.org — Test delivery, eligibility, fees, renewal, score release, test dates, retake fee, retake policy, passing score · verified Nov 2026