  1. Which type of fan failure would most directly cause a radon mitigation system to stop functioning while still appearing operational?

    Answer: A fan with a seized motor producing no airflow

    A seized motor produces no airflow despite any residual noise or indicator light, making the system appear operational while it fails.

  2. When performing quality control on a sub-slab depressurization system, which measurement confirms adequate negative pressure beneath the slab?

    Answer: Differential pressure between sub-slab and interior air

    A negative differential pressure reading (sub-slab lower than interior) confirms the system is creating the intended suction.

  3. According to EPA standards, where must a sub-slab depressurization system exhaust its air?

    Answer: Outside the building above the eave line

    EPA requires exhaust discharge above the eave line and away from windows, doors, and air intakes to prevent re-entry.

  4. A homeowner reports that the U-tube manometer installed on their radon system shows equal fluid levels on both sides. What does this indicate?

    Answer: No pressure differential exists, suggesting the fan may not be operating

    Equal fluid levels in a U-tube manometer indicate no pressure difference, which means the fan is likely not creating sub-slab suction.

  5. What is the minimum number of post-mitigation radon tests required before issuing a compliance certificate under most state programs?

    Answer: One short-term or long-term test

    Most programs require at least one post-mitigation test to verify the system has reduced radon below the action level.

  6. Which record must an RMS retain for a minimum period specified by their certifying body after completing a mitigation project?

    Answer: Installation records, test results, and system diagrams

    Certification bodies require retention of full installation records including test data and system diagrams for quality assurance and dispute resolution.

  7. A crawlspace depressurization system shows radon levels dropping from 18 pCi/L to 5 pCi/L post-installation. What is the correct classification of this outcome?

    Answer: Partially successful — level still above EPA action level

    At 5 pCi/L, the level remains above the 4 pCi/L EPA action level, so the system requires optimization despite significant reduction.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. nrpp.info — Eligibility, score validity, retake policy, fees, registration deadline, time limit, test delivery, exam format · verified Oct 2026