← All RMS Flashcard Decks

Commercial Building Mitigation Flashcards

7 cards from real RMS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Commercial Building Mitigation flashcards as text
  1. A contractor is bidding a commercial SSD project in a multi-tenant office building. Who must be notified before core drilling begins?

    Answer: Building owner, tenants in affected areas, and local building authority if a permit is required

    Core drilling in occupied commercial buildings requires notifying the owner, affected tenants to minimize disruption, and the local authority having jurisdiction if a permit is required.

  2. What is a 'passive stack' in the context of commercial radon-resistant new construction?

    Answer: A pipe installed during construction that vents sub-slab gases without a fan, fan-ready for future activation

    A passive stack is a roughed-in vent pipe installed during construction that uses natural convection; a fan can be added later to convert it to an active system if needed.

  3. Which factor most affects the selection of fan size in a commercial SSD system?

    Answer: Sub-slab aggregate type, slab area, and measured airflow resistance

    Fan sizing depends on the sub-slab material's permeability, total floor area to be covered, and the airflow resistance measured during diagnostic testing.

  4. In a commercial basement with a sump pump, what special consideration applies during SSD installation?

    Answer: The sump pit may serve as a suction point but must be covered with an airtight lid penetrated by the suction pipe

    Sump pits can be effective suction points, but the pit must be sealed with an airtight cover penetrated only by the suction pipe to prevent radon from bypassing the system.

  5. Under OSHA regulations, what personal protective equipment is required for workers core drilling through a concrete slab with potential silica exposure?

    Answer: N95 respirator at minimum; P100 or supplied-air respirator depending on silica levels

    OSHA's silica standard (29 CFR 1926.1153) requires respiratory protection when cutting or drilling concrete, with P100 or supplied-air respirators for higher exposure tasks.

  6. What is the recommended approach when a commercial building has a combination of crawl space, basement, and slab-on-grade areas?

    Answer: Install separate mitigation systems tailored to each foundation type

    Each foundation type has different pressure dynamics and radon pathways; separate systems (SSD, SMD, BVS) designed for each area provide the most reliable mitigation.

  7. After completing a commercial radon mitigation project, what documentation should be provided to the building owner?

    Answer: As-built drawings, system operating parameters, maintenance requirements, and post-mitigation test results

    Complete documentation including as-built drawings, measured pressure and airflow data, maintenance instructions, and post-mitigation test results is required to verify system performance and support future maintenance.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. nrpp.info — Eligibility, score validity, retake policy, fees, registration deadline, time limit, test delivery, exam format · verified Oct 2026