  1. Which federal agency administers the Production Tax Credit (PTC) for renewable energy projects?

    Answer: Internal Revenue Service (IRS)

    The IRS administers the PTC, which provides a per-kilowatt-hour tax credit for electricity generated from qualified renewable sources.

  2. Under the Clean Air Act, which provision specifically requires power plants to obtain permits for greenhouse gas emissions above a certain threshold?

    Answer: Prevention of Significant Deterioration (PSD)

    The PSD program requires major new or modified stationary sources, including power plants, to obtain pre-construction permits and apply Best Available Control Technology.

  3. What is the primary purpose of a Renewable Portfolio Standard (RPS) with a 'carve-out' provision?

    Answer: To set a minimum percentage requirement for a specific technology like solar

    A carve-out within an RPS mandates that a specific portion of the overall renewable requirement must be met by a particular technology, commonly solar.

  4. Which interconnection process under FERC Order 2003 applies to large generators seeking to connect to the transmission grid?

    Answer: Large Generator Interconnection Procedures (LGIP)

    FERC Order 2003 established the LGIP for generators greater than 20 MW seeking transmission-level interconnection.

  5. A developer's wind project qualifies for the Investment Tax Credit (ITC). What does 'commence construction' typically require to lock in the credit rate?

    Answer: Beginning physical work of a significant nature or incurring 5% of total project costs

    IRS guidance allows projects to lock in the ITC rate by either starting physical work of a significant nature or incurring at least 5% of total project costs.

  6. Which document must a utility typically file with FERC to propose changes to its transmission tariff rates?

    Answer: Section 205 Filing

    Under Section 205 of the Federal Power Act, utilities must file proposed rate changes with FERC for approval before they take effect.

  7. When a state RPS allows Renewable Energy Certificate (REC) banking, what does this mean for utilities?

    Answer: Utilities can store excess RECs from one compliance period to use in future periods

    REC banking allows utilities to save surplus RECs from a current period to apply toward future compliance obligations, providing flexibility.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. education.aeecenter.org — Registration deadline · verified Oct 2026
  2. aeecenter.org — Test delivery, exam dates, fees, renewal, retake fee, exam format, retake policy, score release, score validity · verified Oct 2026
  3. portal.aeecenter.org — Time limit · verified Oct 2026