Throughout construction, the installer marks up a set of drawings in red to show where field conditions forced changes to cable routes. What are these marked-up drawings commonly called?
-
A
Shop drawings
-
B
Redlines (as-built markups)
-
C
Schematic design drawings
-
D
Bid drawings