Who is primarily responsible for establishing a Safe System of Work (SSOW) for a group working on or near the line?
-
A
The Person in Charge of Possession (PICOP)
-
B
Each individual track worker for themselves
-
C
The Controller of Site Safety (COSS)
-
D
The signaller in the local signal box