In the context of physical security risk assessment, what does the formula R = T x V x C represent?
-
A
Revenue equals time multiplied by volume multiplied by cost
-
B
Risk equals threat multiplied by vulnerability multiplied by consequence
-
C
Rating equals testing multiplied by verification multiplied by compliance
-
D
Reliability equals throughput multiplied by variance multiplied by capacity