โ† All Product Management Flashcard Decks

Product Quality Management Flashcards

16 cards from real Product Management practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 16 Product Quality Management flashcards as text
  1. Demonstrates the number of units handled properly through the process steps.

    Answer: Yield

    Yield in a process context refers to the percentage or number of units that successfully pass through all process steps without defects or requiring rework. It's a key metric for measuring process efficiency and quality, indicating how many inputs result in acceptable outputs. A higher yield signifies a more efficient and less wasteful process.

  2. Delivering goods that are appropriate for usage and meet requirements

    Answer: Conformance

    Conformance to requirements means that a product or service meets its specified design, standards, and customer expectations. It signifies that the delivered goods are fit for their intended use and fulfill all predefined criteria, which is a fundamental aspect of quality. This ensures the product performs as intended and satisfies user needs.

  3. Accepting responsibility for mistakes or poor performance

    Answer: Cost of Non-Conformance

    The Cost of Non-Conformance (CONC) refers to the expenses incurred due to failures, defects, or poor quality, including rework, scrap, warranty claims, and lost customer goodwill. It represents the financial impact of not meeting quality standards and accepting responsibility for those shortcomings. This cost highlights the importance of quality control.

  4. A standard of quality control defined as one mistake for every million opportunities

    Answer: Six 9s of Quality

    'Six 9s of Quality' (99.9999%) is a quality standard that aims for extremely high reliability, allowing for only 3.4 defects per million opportunities. This level of quality is often sought in critical systems where errors can have severe consequences, such as telecommunications or medical devices. It represents near-perfect performance.

  5. An expense required to fix a discovered flaw before the product is delivered to the consumer

    Answer: Internal Failure Cost

    Internal failure costs are expenses incurred to rectify defects or non-conformances discovered *before* the product is shipped to the customer. These include costs associated with rework, scrap, re-inspection, and retesting. They are distinct from external failure costs, which occur after the product has been delivered to the consumer.

  6. Is carried out to test each individual part, usually a program, to make sure it is as error-free as possible.

    Answer: Unit Test

    Unit testing involves testing individual components or 'units' of software in isolation to verify that each part functions correctly according to its design. This granular level of testing helps identify and fix bugs early in the development cycle, ensuring the building blocks of the system are robust and error-free before integration.

  7. Test the system as a whole as a single unit.

    Answer: System Testing

    System testing evaluates the complete and integrated software system to ensure it meets specified requirements. It tests the entire system as a single entity, verifying that all components work together harmoniously and that the system performs as expected in its intended environment. This comprehensive test ensures the product functions as a whole.

  8. Anything that has to be altered before the program is delivered

    Answer: Software Defect

    A software defect, often called a bug, is an error, flaw, or fault in a computer program that causes it to produce an incorrect or unexpected result, or to behave in unintended ways. These defects must be identified and corrected before the program is delivered to ensure proper functionality and user satisfaction. Any necessary alteration before delivery points to a defect.

  9. Replaces trial and error tactics with scientific investigation in order to eliminate faults.

    Answer: Robust Design Methods

    Robust Design Methods, pioneered by Genichi Taguchi, focus on designing products and processes that are inherently insensitive to variations in manufacturing or environmental conditions. This approach uses scientific investigation and statistical methods to optimize designs, thereby reducing defects and improving quality without relying on costly trial-and-error. It proactively builds quality in, rather than inspecting it out.

  10. Occurs in order to test the functioning of grouped components between unit and system testing.

    Answer: Integration Testing

    Integration testing is performed after unit testing and before system testing, focusing on verifying the interfaces and interactions between different modules or components of a software system. Its purpose is to ensure that these grouped components work together correctly as a cohesive unit, addressing issues that arise when individual units are combined. This bridges the gap between individual component functionality and overall system behavior.

  11. A three-step cycle that includes planning, monitoring, and recording the quality of an organization.

    Answer: ISO 9000

    ISO 9000 is a globally recognized set of standards for quality management systems that guides organizations in establishing and maintaining effective quality processes. It outlines a systematic approach that includes planning for quality, continuously monitoring performance, and meticulously recording quality-related data. This cycle ensures that products and services consistently meet customer and regulatory requirements, fostering continuous improvement.

  12. The price of assessing procedures and results to make sure a project is error-free or has a manageable error range

    Answer: Appraisal Cost

    Appraisal costs are a component of the Cost of Quality, specifically related to evaluating products, processes, and services to ensure they conform to quality standards. These costs are incurred during activities like inspections, testing, and audits, all aimed at assessing quality and identifying defects. The goal is to catch errors before they reach the customer, ensuring a manageable error range.

  13. The initial investment for machinery used for inspection and preventative tasks

    Answer: Measurement and Test Equipment Costs

    Measurement and Test Equipment Costs refer to the capital expenditure on tools and machinery specifically acquired for quality control activities. This includes the initial investment in equipment used for inspecting products, testing components, or performing preventative maintenance tasks. These tools are crucial for maintaining quality standards and ensuring compliance throughout a project's lifecycle.

  14. A charge for all mistakes that are not found and fixed before being delivered to the consumer.

    Answer: External Failure Cost

    External failure costs are incurred when defects are discovered after the product or service has been delivered to the customer. These costs can include expensive warranty repairs, handling customer complaints, product returns, and even costly product recalls. Such failures not only incur direct financial charges but can also severely damage a company's reputation and customer loyalty.

  15. The price of conformance plus the price of non-conformance

    Answer: Cost of Quality

    The Cost of Quality (COQ) is a comprehensive framework that categorizes all expenditures associated with preventing, detecting, and remediating product or service defects. It encompasses both the 'price of conformance,' which includes prevention and appraisal costs, and the 'price of non-conformance,' which covers internal and external failure costs. This holistic view helps organizations understand the total financial impact of their quality management efforts.

  16. The price of organizing a project's planning and execution so that any errors are prevented or kept to a manageable level

    Answer: Prevention Cost

    Prevention costs are incurred to prevent defects from occurring in the first place, representing an investment in quality upfront. These costs include activities like quality planning, employee training, process design, and supplier evaluation. By focusing on proactive measures, organizations aim to minimize errors and rework, keeping potential issues to a manageable level.

Written and edited by , founder of Practice Test Geeks, with AI assistance. We have not yet matched this exam's facts to an official source, so confirm fees, dates and rules with the exam body. Editorial policy