Procore Superintendent Certification Procore Superintendent Safety & Quality 2 — Questions and Answers
Question 1: In Procore, which tool is used to document a formal Non-Conformance Report (NCR) when work does not meet quality specifications?
- Observations (Correct answer)
- Submittals
- Punch List
- Action Plans
Correct answer: Observations
Procore's Observations tool is used to log and track non-conformance items, deficiencies, and quality issues on a project.
Question 2: Under OSHA 29 CFR 1926, what is the required minimum height at which fall protection must be provided for construction workers on walking/working surfaces?
- 4 feet
- 6 feet (Correct answer)
- 8 feet
- 10 feet
Correct answer: 6 feet
OSHA 29 CFR 1926.502 requires fall protection for construction workers at heights of 6 feet or more above a lower level.
Question 3: When a superintendent conducts a safety inspection in Procore, what is the primary deliverable used to document findings and required corrective actions?
- Daily Log entry
- Inspection record with action items (Correct answer)
- Meeting minutes
- RFI response
Correct answer: Inspection record with action items
Procore's Inspections tool generates a record with itemized findings and linked action items that must be resolved and closed out.
Question 4: A subcontractor submits concrete mix designs for approval. In Procore, which workflow handles the formal review and approval of this technical submittal?
- Observations
- Submittals (Correct answer)
- RFIs
- Change Orders
Correct answer: Submittals
Procore's Submittals tool manages the submission, review, and approval workflow for shop drawings, material data, and mix designs.
Question 5: Which OSHA recordkeeping form must a superintendent ensure is completed within 7 calendar days of a recordable work-related injury or illness?
- OSHA Form 300
- OSHA Form 300A
- OSHA Form 301 (Correct answer)
- OSHA Form 200
Correct answer: OSHA Form 301
OSHA Form 301 (Injury and Illness Incident Report) must be completed within 7 calendar days of a recordable incident.
Question 6: In Procore's safety management, what is the purpose of using the 'Manpower' feature within the Daily Log?
- Tracking safety violations per crew
- Recording worker headcount and hours by company for productivity and safety accountability (Correct answer)
- Scheduling safety training sessions
- Logging equipment inspection results
Correct answer: Recording worker headcount and hours by company for productivity and safety accountability
The Manpower feature in Procore's Daily Log records the number of workers and hours by subcontractor, supporting both productivity tracking and safety accountability.
Question 7: A quality control plan (QCP) on a federal construction project typically requires three phases of inspection. Which phase occurs BEFORE construction activities begin?
- Follow-up inspection
- Preparatory inspection (Correct answer)
- Initial inspection
- Final inspection
Correct answer: Preparatory inspection
The preparatory phase inspection occurs before starting each definable feature of work to verify materials, equipment, and workers are ready and meet specifications.
In Procore, which tool is used to document a formal Non-Conformance Report (NCR) when work does not meet quality specifications?