What does 'peak shaving' mean in the context of PECO demand management programs?
-
A
Reducing electricity consumption during the highest demand periods to lower grid stress and capacity costs
-
B
Trimming overgrown trees near transmission lines to prevent outages
-
C
Cutting generation output at peak efficiency points to extend turbine life
-
D
Reducing billing peaks through budget billing enrollment