Working at Height Regulations Flashcards
6 cards from real PASMA practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Working at Height Regulations flashcards as text
What does WAHR 2005 require regarding the prevention of falling objects from a tower scaffold?
Answer: Measures must be taken to prevent objects falling, or the area below must be barricaded to prevent access
Regulation 10 requires that steps are taken to prevent objects falling from height (e.g., toeboards, sheeting, tool lanyards). If objects could still fall, the area below must be barricaded or cordoned off to prevent access.
Under WAHR 2005, what is the requirement for providing personal protective equipment (PPE) for work at height?
Answer: PPE should be used as a last resort after collective protection measures have been considered
Under the WAHR 2005 hierarchy, personal protective equipment (such as harnesses) should only be used when collective protection measures (such as guard rails) are not reasonably practicable. PPE is the last resort, not the first option.
What must be done with a tower scaffold inspection report if the tower is moved to a different location on site?
Answer: A new inspection must be carried out and a new report produced at the new location
Moving a tower constitutes an event that could affect its stability — different ground conditions, proximity to hazards, exposure to wind. A new pre-use inspection and report are required after the tower is re-erected or repositioned.
What does Regulation 6 of WAHR 2005 require regarding avoiding work at height?
Answer: Work at height must be avoided so far as is reasonably practicable
Regulation 6 requires that work at height is avoided so far as is reasonably practicable. If it cannot be avoided, suitable measures must be put in place to prevent or minimise falls.
Which body is responsible for enforcing the Work at Height Regulations 2005 on construction sites?
Answer: The Health and Safety Executive (HSE)
The Health and Safety Executive (HSE) is the primary enforcement body for health and safety legislation on construction sites. HSE inspectors can issue improvement notices, prohibition notices, and prosecute for breaches.
What information must be included in a written rescue plan for work at height?
Answer: The rescue method, equipment available, personnel trained, communication procedures, and estimated rescue time
A rescue plan must detail how a casualty will be reached and recovered, the equipment to be used, who is trained to carry out the rescue, how communication will work, and the expected time to complete the rescue.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- pasma.co.uk — Eligibility, exam dates, passing score, time limit, score validity, test delivery, fees, renewal, retake policy · verified Oct 2026