Tower Inspection Procedures Flashcards

6 cards from real PASMA practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Tower Inspection Procedures flashcards as text
  1. What role does photographic evidence play in tower scaffold inspections?

    Answer: Photographs can supplement written reports by providing visual evidence of defects, conditions, and the overall state of the tower

    While not a legal requirement, photographs are valuable supplementary evidence. They provide visual records of defects, general condition, and site context. However, they supplement rather than replace the formal written inspection report.

  2. What training must a person have to carry out formal tower scaffold inspections?

    Answer: They must be a competent person with relevant training such as PASMA, plus experience in identifying tower scaffold defects

    The inspector must be a competent person as defined by WAHR 2005, with sufficient training, experience, and knowledge to identify defects and assess risks. PASMA tower inspection training is the recognised standard for this competence.

  3. How should the results of tower scaffold inspections be communicated to workers who will use the tower?

    Answer: Through a combination of scaffold tags, written reports available on site, and verbal briefings

    Workers need to know the tower's status before using it. This is achieved through visible scaffold tags (green = safe), accessible written reports, and verbal briefings during toolbox talks or pre-start meetings. Workers should also know to report any changes they observe.

  4. What should an inspector verify about the height-to-base ratio during a tower inspection?

    Answer: That the actual height does not exceed the permitted ratio (3:1 outdoors, 3.5:1 indoors) for the base dimensions, or that stabilisers extend the effective base

    The inspector must verify the tower's actual height against its narrowest base dimension. For outdoor use, the maximum ratio is generally 3:1, and for indoor use 3.5:1. If stabilisers are fitted, their extended dimensions form the effective base for calculation.

  5. What is the consequence of failing to maintain proper tower scaffold inspection records?

    Answer: It is a breach of WAHR 2005, potentially resulting in enforcement action, prohibition notices, fines, or prosecution

    Failure to maintain inspection records is a breach of Schedule 6 of WAHR 2005. The HSE can issue improvement notices, prohibition notices (stopping the work), or prosecute. In the event of an accident, absent records significantly worsen the legal position.

  6. When inspecting a tower scaffold used for extended periods, what additional consideration applies?

    Answer: Increased frequency of checks for wear, fatigue, corrosion, and loosening of components due to prolonged use and repeated loading

    Towers in long-term use are subject to cumulative wear, metal fatigue, progressive corrosion (especially outdoors), and gradual loosening of components. Inspection frequency and detail should reflect these additional risks, potentially exceeding the minimum 7-day interval.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. pasma.co.uk — Eligibility, exam dates, passing score, time limit, score validity, test delivery, fees, renewal, retake policy · verified Oct 2026